FLANGE,WN,10IN,600#,A105,RF

Material 4100034345 · FLANGE · Plant 1000

AReorderCriticalStockout
Material
4100034345
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
SINAR TEKNIK INTERNASIONAL PT
Lead time
42 d · P80 78 d
Unit price
Rp 2.5M

Recommendation

  • 1.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~42 days; expected demand during lead time 0.3.
  • 3.A 97.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 9.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 22.3M · order by 01 Oct 2026
Expected arrival ≈ 42 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
9
order qty 9
Service level
97.0%
stockout risk now 3%
Unit price
Rp 2.5M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 104.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1108C
INHIBITOR TLE
A100.22

Lead time and procurement

Lead time 42 ± 25 days (PO history + category, 1 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
25 Feb 2026PR03
Regular replenishment
2Rp 2.5M04 Apr 202638 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
15 Jan 20269201000002562Corrective