FLANGE,WN,10IN,600#,A105,RF
Material 4100034345 · FLANGE · Plant 1000
AReorderCriticalStockout
- Material
- 4100034345
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- SINAR TEKNIK INTERNASIONAL PT
- Lead time
- 42 d · P80 78 d
- Unit price
- Rp 2.5M
Recommendation
- 1.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~42 days; expected demand during lead time 0.3.
- 3.A 97.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 9.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 22.3M · order by 01 Oct 2026
Expected arrival ≈ 42 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
9
order qty 9
Service level
97.0%
stockout risk now 3%
Unit price
Rp 2.5M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 104.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1108C INHIBITOR TLE | A | 1 | 0 | 0.22 |
Lead time and procurement
Lead time 42 ± 25 days (PO history + category, 1 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 25 Feb 2026 | PR03 Regular replenishment | 2 | Rp 2.5M | 04 Apr 2026 | 38 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Jan 2026 | 9 | 201000002562 | Corrective |