Sparely
DU

FLANGE,SO,6IN,150#,A105,RF

Material 4100034452 · FLANGE · Plant 1000

CMonitorSlow-moving
Material
4100034452
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
43 d · P80 78 d
Unit price
Rp 927,596 (est.)

Recommendation

  • 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~43 days; expected demand during lead time 0.2.
  • 3.A 95.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 5.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
5
order qty 5
Service level
95.3%
stockout risk now 5%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 320 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~19 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-FG-20458-A41A-HS
PIPE-3/4 FROM HE-600D TO VD-1218
C130.87
PX_6-P-1453-A22A
PIPE-6 FROM HE-1025 TO PP-1768C
C100.01

Lead time and procurement

Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Aug 2026MediumPX_3/4-FG-20458-A41A-HSReplace lamp as per PM finding
27 Dec 2025MediumPX_3/4-FG-20458-A41A-HSClean dummy leg 3/4-FG-20458-A41A-HS
24 May 2025MediumPX_3/4-FG-20458-A41A-HSReinject compound online clamp sealing

Recent goods issues

Posting dateQtyOrderOrder type
15 Nov 20255201000032883Corrective