VALVE,GATE,1-1/2IN,300#,CF8,RF

Material 4100034556 · VALVE · Plant 1000

ALong-leadReduceExcess
Material
4100034556
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (19 of 46 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
75 d · P80 102 d
Unit price
Rp 7.8M

Recommendation

  • 1.Forecast 197 EA/year: 197 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~75 days; expected demand during lead time 40.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 101, order up to 121.
  • 4.Stock 287 exceeds the level to keep (121) by 166.
  • 5.Long lead time: 80% of deliveries took up to 102 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 46 FuncLoc(s), 19 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 28Single sourceAbnormal consumptionOpen PO
On hand / on order
287 / 1,326
next delivery 04 Oct 2026
Today Min / Max
82 / 247
static parameters in BoM
Rec. Min (reorder point)
101
safety stock 61
Rec. Max
121
order qty 20
Service level
99.9%
stockout risk now 0%
Unit price
Rp 7.8M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 56 issue days in the last 180 days, last issue 1 days ago, 111 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 21 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (34 units) excluded from the baseline.

Demand pattern Smooth · 179 issue days · 21 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 51.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 46 functional locations

19 with criticality A/B · 59 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A32911.58
PX_BF-104
CRACKING FURNACE BF-104
A42811.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PY_VD-1557A
RICH AMINE SEPARATOR
A120.08
PX_3/4-IA-29930-A22A-T
PIPE-3/4 FROM HE-1217C TO HE-1774A
A100.01
PX_VD-1822
QUENCH OIL SURGE DRUM
A100.08
PX_VD-749A
PROPYLENE SEPARATOR
A100.08

Lead time and procurement

Lead time 75 ± 32 days (PO history, 57 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
21 Sept 2026PR04
Regular (other)
127Rp 7.7M01 Jan 2027
open
102 d
07 Sept 2026PR03
Regular replenishment
156Rp 7.5M11 Nov 2026
open
65 d
30 Aug 2026PR03
Regular replenishment
133Rp 7.8M04 Dec 2026
open
96 d
24 Aug 2026PR03
Regular replenishment
144Rp 8.0M27 Nov 2026
open
95 d
17 Aug 2026PR06
Regular replenishment
93Rp 7.8M10 Oct 2026
open
54 d
17 Aug 2026PR03
Regular replenishment
120Rp 8.0M09 Oct 2026
open
53 d
10 Aug 2026PR03
Regular replenishment
142Rp 8.0M09 Nov 2026
open
91 d
04 Aug 2026PR03
Regular replenishment
87Rp 7.6M04 Oct 2026
open
61 d
26 Jul 2026PR03
Regular replenishment
84Rp 7.8M01 Nov 2026
open
98 d
17 Jul 2026PR03
Regular replenishment
157Rp 7.7M15 Aug 202629 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000012524Corrective
30 Sept 20261201000017495Corrective
26 Sept 20264209000029477Other maintenance
22 Sept 20261201000006563Corrective
22 Sept 20262204000002989Preventive
21 Sept 20261201000006305Corrective
19 Sept 20261201000024840Corrective
17 Sept 20261201000022353Corrective
14 Sept 20261201000010974Corrective
10 Sept 20261204000002121Preventive
06 Sept 20264201000031451Corrective
28 Aug 20262201000007926Corrective
24 Aug 20261201000000994Corrective
15 Aug 20261204000039855Preventive
13 Aug 20262201000031702Corrective