VALVE,GATE,6IN,300#,A216WCB,RF
Material 4100034575 · VALVE · Plant 1000
AMonitorHealthy
- Material
- 4100034575
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (11 of 23 FuncLocs A/B)
- Supplier
- PERMATA SUPLINDO MAKMUR PT
- Lead time
- 49 d · P80 67 d
- Unit price
- Rp 416,181
Recommendation
- 1.Forecast 91 EA/year: 91 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~49 days; expected demand during lead time 12.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 37, order up to 95.
- 4.Installed on 23 FuncLoc(s), 11 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 17Single sourceAbnormal consumptionOpen PO
On hand / on order
46 / 147
next delivery 14 Oct 2026
Today Min / Max
34 / 73
static parameters in BoM
Rec. Min (reorder point)
37
safety stock 25
Rec. Max
95
order qty 58
Service level
99.9%
stockout risk now 0%
Unit price
Rp 416,181
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 31 issue days in the last 180 days, last issue 4 days ago, 92 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 11 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (18 units) excluded from the baseline.
Demand pattern Erratic · 94 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 28.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 23 functional locations
11 with criticality A/B · 28 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 1 | 73 | 27.01 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1 | 28 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1 | 23 | 9.01 |
| PX_VD-1642 HYDROGEN KO DRUM | A | 1 | 2 | 0.08 |
| PX_VD-123A C3 RECYCLE SEPARATOR | A | 4 | 1 | 0.08 |
| PX_VD-1822 QUENCH OIL SURGE DRUM | A | 1 | 0 | 0.08 |
| PX_VD-958 LEAN AMINE KO DRUM | A | 1 | 0 | 0.08 |
| PX_1-FG-18043-C11A-T PIPE-1 FROM PP-745 TO PP-225A | C | 1 | 2 | 0.87 |
Lead time and procurement
Lead time 49 ± 26 days (PO history, 29 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Sept 2026 | PR03 Regular replenishment | 56 | Rp 411,925 | 26 Nov 2026 open | 65 d |
| 18 Sept 2026 | PR03 Regular replenishment | 23 | Rp 434,727 | 14 Oct 2026 open | 26 d |
| 18 Aug 2026 | PR06 Regular replenishment | 51 | Rp 428,509 | 15 Sept 2026 | 28 d |
| 17 Aug 2026 | PR03 Regular replenishment | 63 | Rp 433,302 | 26 Sept 2026 | 40 d |
| 31 Jul 2026 | PR03 Regular replenishment | 19 | Rp 412,741 | 03 Sept 2026 | 34 d |
| 13 Jul 2026 | PR05 Project / turnaround | 68 | Rp 403,167 | 30 Oct 2026 open | 109 d |
| 24 Jun 2026 | PR03 Regular replenishment | 35 | Rp 422,018 | 10 Aug 2026 | 47 d |
| 29 May 2026 | PR01 Import / long-lead | 38 | Rp 435,482 | 26 Sept 2026 | 120 d |
| 28 May 2026 | PR01 Import / long-lead | 42 | Rp 433,907 | 13 Aug 2026 | 77 d |
| 28 May 2026 | PR06 Regular replenishment | 37 | Rp 413,294 | 21 Jul 2026 | 54 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Sept 2026 | 1 | 201000014873 | Corrective |
| 24 Sept 2026 | 1 | 209000029477 | Other maintenance |
| 22 Sept 2026 | 1 | 201000037585 | Corrective |
| 20 Sept 2026 | 2 | 201000020402 | Corrective |
| 19 Sept 2026 | 1 | 201000003432 | Corrective |
| 03 Sept 2026 | 1 | 201000031484 | Corrective |
| 01 Sept 2026 | 1 | 201000024663 | Corrective |
| 19 Aug 2026 | 1 | 201000002111 | Corrective |
| 14 Aug 2026 | 1 | 201000024806 | Corrective |
| 13 Aug 2026 | 1 | 201000020105 | Corrective |
| 06 Aug 2026 | 1 | 201000005043 | Corrective |
| 01 Aug 2026 | 1 | 201000008499 | Corrective |
| 31 Jul 2026 | 1 | 201000033262 | Corrective |
| 27 Jul 2026 | 1 | 201000027402 | Corrective |
| 22 Jul 2026 | 1 | 201000003669 | Corrective |