VALVE,GATE,2IN,300#,CF8,RF
Material 4100034702 · VALVE · Plant 1000
AReduceExcess
- Material
- 4100034702
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 33 d · P80 31 d
- Unit price
- Rp 2.5M
Recommendation
- 1.Forecast 19 EA/year: 19 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~33 days; expected demand during lead time 1.7.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 19.
- 4.Stock 33 exceeds the level to keep (19) by 14.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 94% probability of demand in the next 90 days.
ML early warningLast turnaround used 3Single sourceOpen PO
On hand / on order
33 / 8
next delivery 24 Oct 2026
Today Min / Max
7 / 20
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
19
order qty 11
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.5M
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 35 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern Intermittent · 21 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_VD-1186 COOLING WATER ACCUMULATOR | A | 1 | 2 | 0.51 |
| PX_VD-1729 PROPYLENE KO DRUM | A | 1 | 2 | 0.08 |
| PX_3/4-CW-5168-A11A-HS PIPE-3/4 FROM PP-1638B TO PP-703B | C | 1 | 0 | 0.01 |
| PX_3/4-CW-7128-C11A-H PIPE-3/4 FROM PP-818 TO PP-1404A | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 33 ± 23 days (PO history, 8 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Sept 2026 | PR01 Import / long-lead | 8 | Rp 2.5M | 24 Oct 2026 open | 34 d |
| 26 Dec 2025 | PR03 Regular replenishment | 15 | Rp 2.5M | 16 Jan 2026 | 21 d |
| 11 Oct 2025 | PR03 Regular replenishment | 6 | Rp 2.4M | 23 Dec 2025 | 73 d |
| 09 Oct 2025 | PR06 Regular replenishment | 9 | Rp 2.5M | 20 Oct 2025 | 11 d |
| 05 Sept 2025 | PR03 Regular replenishment | 5 | Rp 2.5M | 23 Sept 2025 | 18 d |
| 15 Jul 2025 | PR06 Regular replenishment | 9 | Rp 2.5M | 11 Aug 2025 | 27 d |
| 05 Jun 2025 | PR06 Regular replenishment | 12 | Rp 2.4M | 18 Jun 2025 | 13 d |
| 21 May 2025 | PR06 Regular replenishment | 10 | Rp 2.5M | 10 Jun 2025 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 08 Sept 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 30 Aug 2026 | High | PX_BF-102 | Painting BF-102 |
| 27 Aug 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 15 Aug 2026 | Medium | PX_BF-107 | Hot spot at convection BF-107 |
| 14 Aug 2026 | Emergency | PX_BF-102 | Thermograph wall BF-102 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Aug 2026 | 1 | 201000033086 | Corrective |
| 05 Aug 2026 | 3 | 201000036260 | Corrective |
| 02 Aug 2026 | 2 | 201000008499 | Corrective |
| 20 Jun 2026 | 2 | 204000004159 | Preventive |
| 13 May 2026 | 1 | 201000023302 | Corrective |
| 28 Apr 2026 | 1 | 201000002499 | Corrective |
| 18 Apr 2026 | 1 | 201000006270 | Corrective |
| 06 Apr 2026 | 1 | 201000010228 | Corrective |
| 18 Jan 2026 | 1 | 201000023909 | Corrective |
| 14 Jan 2026 | 1 | 201000014126 | Corrective |
| 19 Dec 2025 | 2 | 201000023528 | Corrective |
| 01 Dec 2025 | 1 | 203000037280 | Turnaround |
| 22 Nov 2025 | 2 | 203000038363 | Turnaround |
| 17 Nov 2025 | 1 | 201000002039 | Corrective |
| 02 Nov 2025 | 1 | 201000010987 | Corrective |