VALVE,GATE,4IN,800#,A216WCB,SW

Material 4100034704 · VALVE · Plant 1000

ALong-leadMaintainStockout
Material
4100034704
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
71 d · P80 109 d
Unit price
Rp 21.0M

Recommendation

  • 1.Forecast 24 EA/year: 24 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~71 days; expected demand during lead time 4.7.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 20.
  • 4.Long lead time: 80% of deliveries took up to 109 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 96% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 2Single sourceOpen PO
On hand / on order
0 / 25
next delivery 04 Oct 2026
Today Min / Max
7 / 21
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 11
Rec. Max
20
order qty 5
Service level
99.6%
stockout risk now 0%
Unit price
Rp 21.0M
PO history
ML early warning: 96% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 10 issue days in the last 180 days, last issue 2 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Lumpy · 19 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 5 functional locations

4 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_VD-1210
C4 PRODUCT ACCUMULATOR
A100.08
PX_BF-101
CRACKING FURNACE BF-101
S183.02

Lead time and procurement

Lead time 71 ± 43 days (PO history, 12 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
11 Aug 2026PR06
Regular replenishment
11Rp 20.9M04 Oct 2026
open
54 d
13 Jul 2026PR04
Regular (other)
10Rp 21.7M31 Oct 2026
open
110 d
02 Jun 2026PR06
Regular replenishment
10Rp 21.1M06 Jul 202634 d
19 May 2026PR04
Regular (other)
4Rp 21.9M10 Nov 2026
open
175 d
24 Mar 2026PR06
Regular replenishment
4Rp 20.4M02 Jun 202670 d
23 Feb 2026PR01
Import / long-lead
10Rp 20.6M10 Jun 2026107 d
25 Nov 2025PR06
Regular replenishment
11Rp 21.0M26 Dec 202531 d
10 Nov 2025PR03
Regular replenishment
4Rp 20.8M03 Jan 202654 d
24 Oct 2025PR05
Project / turnaround
7Rp 21.5M18 Feb 2026117 d
30 Aug 2025PR06
Regular replenishment
12Rp 21.7M21 Sept 202522 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112

Recent goods issues

Posting dateQtyOrderOrder type
29 Sept 20262201000013476Corrective
26 Sept 20261201000005210Corrective
12 Sept 20261201000020269Corrective
30 Jun 20261209000022177Other maintenance
21 Jun 20261209000014083Other maintenance
21 Jun 20261209000016742Other maintenance
17 Jun 20262201000020554Corrective
16 Jun 20261201000024271Corrective
13 Jun 20262209000014321Other maintenance
08 Jun 20261201000006846Corrective
12 Apr 20262201000017882Corrective
01 Feb 20261201000015284Corrective
24 Jan 20261201000030431Corrective
14 Jan 20262201000007390Corrective
02 Jan 20261201000001557Corrective