Sparely
DU

VALVE,GATE,1IN,150#,A216WCB,SW

Material 4100034740 · VALVE · Plant 1000

SReduceExcess
Material
4100034740
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
35 d · P80 39 d
Unit price
Rp 9.3M

Recommendation

  • 1.Forecast 8.9 EA/year: 8.9 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~35 days; expected demand during lead time 0.9.
  • 3.A 84.2% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 6.
  • 4.Stock 131 exceeds the level to keep (6) by 125.
  • 5.ML early warning: 80% probability of demand in the next 90 days.
ML early warningLast turnaround used 5Single sourceOpen PO
On hand / on order
131 / 7
next delivery 13 Nov 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
6
order qty 4
Service level
84.2%
stockout risk now 0%
Unit price
Rp 9.3M
PO history
ML early warning: 80% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 52 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (11 units) excluded from the baseline.

Demand pattern Intermittent · 14 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 14.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-110
CRACKING FURNACE BF-110
S14114.58

Lead time and procurement

Lead time 35 ± 15 days (PO history, 11 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
22 Sept 2026PR03
Regular replenishment
7Rp 9.1M13 Nov 2026
open
52 d
19 Jul 2026PR03
Regular replenishment
11Rp 9.4M06 Sept 202649 d
27 Jun 2026PR03
Regular replenishment
5Rp 9.2M25 Jul 202628 d
14 Apr 2026PR03
Regular replenishment
8Rp 9.2M19 May 202635 d
27 Mar 2026PR03
Regular replenishment
5Rp 9.3M23 Apr 202627 d
02 Mar 2026PR03
Regular replenishment
11Rp 9.3M21 Mar 202619 d
31 Jan 2026PR06
Regular replenishment
12Rp 9.6M05 Mar 202633 d
31 Dec 2025PR06
Regular replenishment
14Rp 9.3M23 Jan 202623 d
25 Sept 2025PR03
Regular replenishment
6Rp 9.4M20 Oct 202525 d
14 Sept 2025PR06
Regular replenishment
6Rp 9.3M23 Oct 202539 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
01 Sept 2026MediumPX_BF-110Replace burner tip BF-110
30 Aug 2026LowPX_BF-110Leak from packing
07 Aug 2026MediumPX_BF-110Install scaffolding at BF-110
07 Aug 2026MediumPX_BF-110Painting BF-110

Recent goods issues

Posting dateQtyOrderOrder type
10 Aug 20261204000013772Preventive
12 Jun 20261201000032235Corrective
17 Feb 20261201000034983Corrective
05 Jan 20261201000039015Corrective
30 Dec 20251201000019301Corrective
27 Dec 20251201000022706Corrective
25 Dec 20252203000006078Turnaround
21 Dec 20251203000022966Turnaround
06 Nov 20253201000023889Corrective
05 Nov 20252203000033996Turnaround
26 Sept 20251201000032684Corrective
22 Sept 20251209000019126Other maintenance
04 Sept 20253203000006879Turnaround
25 Aug 20251209000020844Other maintenance
20 Aug 20251204000014466Preventive
Sparely