VALVE,GATE,6IN,800#,CF8,RF
Material 4100034753 · VALVE · Plant 1000
AReduceExcess
- Material
- 4100034753
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 5 FuncLocs A/B)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 34 d · P80 39 d
- Unit price
- Rp 5.9M
Recommendation
- 1.Forecast 15 EA/year: 15 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~34 days; expected demand during lead time 1.3.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 14.
- 4.Stock 196 exceeds the level to keep (14) by 182.
- 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
- 6.ML early warning: 90% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single source
On hand / on order
196 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
14
order qty 7
Service level
99.9%
stockout risk now 0%
Unit price
Rp 5.9M
PO history
ML early warning: 90% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 1 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (4 units) excluded from the baseline.
Demand pattern Intermittent · 16 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1 | 114 | 42.86 |
| PX_2-DS-12644-D12A-HS PIPE-2 FROM VD-1609A TO PP-700 | B | 1 | 0 | 0.01 |
| PX_8-P-21146-A41A-T PIPE-8 FROM VD-884 TO PP-1752A | C | 1 | 1 | 0.01 |
| PX_12-DS-21002-A21A PIPE-12 FROM PP-1808A TO HE-1794A | C | 1 | 0 | 0.01 |
| PX_6-MS-27064-B22A-T PIPE-6 FROM VD-1815A TO VD-719 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 34 ± 21 days (PO history, 8 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Aug 2026 | PR06 Regular replenishment | 5 | Rp 5.9M | 13 Aug 2026 | 12 d |
| 10 Jul 2026 | PR03 Regular replenishment | 7 | Rp 5.8M | 14 Aug 2026 | 35 d |
| 19 May 2026 | PR03 Regular replenishment | 9 | Rp 5.9M | 29 Jun 2026 | 41 d |
| 12 Apr 2026 | PR03 Regular replenishment | 6 | Rp 6.0M | 02 May 2026 | 20 d |
| 28 Jan 2026 | PR03 Regular replenishment | 5 | Rp 6.1M | 02 Apr 2026 | 64 d |
| 28 Dec 2025 | PR06 Regular replenishment | 3 | Rp 5.8M | 10 Jan 2026 | 13 d |
| 23 Oct 2025 | PR03 Regular replenishment | 8 | Rp 5.9M | 09 Nov 2025 | 17 d |
| 19 May 2025 | PR06 Regular replenishment | 6 | Rp 6.2M | 15 Jun 2025 | 27 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 14 Sept 2026 | Low | PX_BF-105 | Install cover plate BF-105 |
| 13 Sept 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
| 06 Sept 2026 | Medium | PX_BF-105 | Repair insulation BF-105 |
| 01 Sept 2026 | Low | PX_BF-105 | Peep door broken BF-105 |
| 30 Aug 2026 | Medium | PX_BF-105 | Painting BF-105 |
| 29 Aug 2026 | Medium | PX_BF-105 | Leak from packing |
| 27 Aug 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 1 | 201000005214 | Corrective |
| 30 Jul 2026 | 2 | 201000038476 | Corrective |
| 07 May 2026 | 1 | 204000003804 | Preventive |
| 13 Apr 2026 | 1 | 201000017882 | Corrective |
| 28 Feb 2026 | 1 | 201000038413 | Corrective |
| 23 Feb 2026 | 1 | 201000033103 | Corrective |
| 18 Feb 2026 | 1 | 201000018164 | Corrective |
| 22 Jan 2026 | 2 | 201000015024 | Corrective |
| 02 Jan 2026 | 1 | 201000003974 | Corrective |
| 22 Dec 2025 | 1 | 201000009100 | Corrective |
| 11 Dec 2025 | 1 | 203000002972 | Turnaround |
| 08 Dec 2025 | 1 | 201000001903 | Corrective |
| 19 Nov 2025 | 2 | 203000038363 | Turnaround |
| 07 Nov 2025 | 1 | 203000004034 | Turnaround |
| 31 Oct 2025 | 1 | 209000022917 | Other maintenance |