Sparely
DU

VALVE,GATE,6IN,800#,CF8,RF

Material 4100034753 · VALVE · Plant 1000

AReduceExcess
Material
4100034753
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
34 d · P80 39 d
Unit price
Rp 5.9M

Recommendation

  • 1.Forecast 15 EA/year: 15 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~34 days; expected demand during lead time 1.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 14.
  • 4.Stock 196 exceeds the level to keep (14) by 182.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 90% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single source
On hand / on order
196 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
14
order qty 7
Service level
99.9%
stockout risk now 0%
Unit price
Rp 5.9M
PO history
ML early warning: 90% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 1 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (4 units) excluded from the baseline.

Demand pattern Intermittent · 16 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 5 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_2-DS-12644-D12A-HS
PIPE-2 FROM VD-1609A TO PP-700
B100.01
PX_8-P-21146-A41A-T
PIPE-8 FROM VD-884 TO PP-1752A
C110.01
PX_12-DS-21002-A21A
PIPE-12 FROM PP-1808A TO HE-1794A
C100.01
PX_6-MS-27064-B22A-T
PIPE-6 FROM VD-1815A TO VD-719
C100.01

Lead time and procurement

Lead time 34 ± 21 days (PO history, 8 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
01 Aug 2026PR06
Regular replenishment
5Rp 5.9M13 Aug 202612 d
10 Jul 2026PR03
Regular replenishment
7Rp 5.8M14 Aug 202635 d
19 May 2026PR03
Regular replenishment
9Rp 5.9M29 Jun 202641 d
12 Apr 2026PR03
Regular replenishment
6Rp 6.0M02 May 202620 d
28 Jan 2026PR03
Regular replenishment
5Rp 6.1M02 Apr 202664 d
28 Dec 2025PR06
Regular replenishment
3Rp 5.8M10 Jan 202613 d
23 Oct 2025PR03
Regular replenishment
8Rp 5.9M09 Nov 202517 d
19 May 2025PR06
Regular replenishment
6Rp 6.2M15 Jun 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105
29 Aug 2026MediumPX_BF-105Leak from packing
27 Aug 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000005214Corrective
30 Jul 20262201000038476Corrective
07 May 20261204000003804Preventive
13 Apr 20261201000017882Corrective
28 Feb 20261201000038413Corrective
23 Feb 20261201000033103Corrective
18 Feb 20261201000018164Corrective
22 Jan 20262201000015024Corrective
02 Jan 20261201000003974Corrective
22 Dec 20251201000009100Corrective
11 Dec 20251203000002972Turnaround
08 Dec 20251201000001903Corrective
19 Nov 20252203000038363Turnaround
07 Nov 20251203000004034Turnaround
31 Oct 20251209000022917Other maintenance
Sparely