VALVE,GATE,10IN,150#,A216WCB,RF

Material 4100034770 · VALVE · Plant 1000

BMaintainStockout
Material
4100034770
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
54 d · P80 69 d
Unit price
Rp 16.1M

Recommendation

  • 1.Forecast 8.6 EA/year: 8.6 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~54 days; expected demand during lead time 1.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 4.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 77% probability of demand in the next 90 days.
ML early warningLast turnaround used 8Single sourceOpen PO
On hand / on order
0 / 9
next delivery 14 Oct 2026
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
8
order qty 3
Service level
99.6%
stockout risk now 0%
Unit price
Rp 16.1M
PO history
ML early warning: 77% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 61 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (8 units) excluded from the baseline.

Demand pattern Lumpy · 12 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 737.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-914
LEAN AMINE ACCUMULATOR
B150.93
PX_1-LS-20681-A11A
PIPE-1 FROM HE-966 TO PP-1765B
C110.01

Lead time and procurement

Lead time 54 ± 28 days (PO history, 10 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
09 Aug 2026PR06
Regular replenishment
10Rp 16.1M31 Aug 202622 d
26 Jul 2026PR03
Regular replenishment
7Rp 16.8M19 Sept 202655 d
06 Jul 2026PR06
Regular replenishment
6Rp 15.6M17 Aug 202642 d
21 Jun 2026PR01
Import / long-lead
9Rp 15.8M14 Oct 2026
open
115 d
18 Feb 2026PR06
Regular replenishment
7Rp 15.6M26 Apr 202667 d
13 Feb 2026PR03
Regular replenishment
9Rp 16.4M18 Mar 202633 d
10 Jan 2026PR03
Regular replenishment
11Rp 15.7M15 Mar 202664 d
09 Dec 2025PR03
Regular replenishment
10Rp 16.1M02 Feb 202655 d
20 Nov 2025PR03
Regular replenishment
11Rp 16.4M03 Feb 202675 d
25 Jun 2025PR03
Regular replenishment
5Rp 16.6M27 Jul 202532 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_VD-914Leak from packing
04 Aug 2026MediumPX_VD-914Leak from packing
10 Jun 2026LowPX_VD-914Install scaffolding at VD-914
12 Apr 2026MediumPX_VD-914Install scaffolding at VD-914
19 May 2025MediumPX_VD-914Replace lamp as per PM finding
11 May 2025MediumPX_1-LS-20681-A11A[MSI-B-25-KNB-190/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
01 Aug 20261201000008499Corrective
19 Jun 20261209000014083Other maintenance
18 Jun 20262201000018305Corrective
10 Jun 20261209000014321Other maintenance
18 Jan 20262201000011434Corrective
13 Jan 20262201000009620Corrective
08 Jan 20261201000039271Corrective
08 Jan 20261203000006950Turnaround
30 Nov 20252203000020446Turnaround
24 Nov 20252203000020131Turnaround
09 Nov 20253203000033996Turnaround
03 Oct 20251201000038148Corrective
13 Sept 20251201000012323Corrective
03 Aug 20251201000004140Corrective
07 Jul 20251209000007603Other maintenance