Sparely
DU

VALVE,GATE,10IN,300#,A105,RF

Material 4100034824 · VALVE · Plant 1000

CMaintainHealthy
Material
4100034824
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
MEGA TEKNOLOGI SENTOSA PT
Lead time
54 d · P80 78 d
Unit price
Rp 9.3M

Recommendation

  • 1.Forecast 5.2 EA/year: 5.2 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~54 days; expected demand during lead time 0.8.
  • 3.A 86.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 5.
  • 4.ML early warning: 65% probability of demand in the next 90 days.
ML early warningLast turnaround used 2Single sourceOpen PO
On hand / on order
5 / 4
next delivery 01 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
5
order qty 3
Service level
86.8%
stockout risk now 0%
Unit price
Rp 9.3M
PO history
ML early warning: 65% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 93 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 40.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.

Installed on 3 functional locations

0 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3-HS-12743-C11A-T
PIPE-3 FROM VD-703A TO PP-817
C400.01
PX_6-LS-25987-A51A-C
PIPE-6 FROM PP-439B TO PP-1141D
C100.01
PX_VD-1012
CHARGE GAS ACCUMULATOR
C100.08

Lead time and procurement

Lead time 54 ± 31 days (PO history, 8 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
27 Aug 2026PR03
Regular replenishment
4Rp 9.3M01 Oct 2026
open
35 d
05 Jul 2026PR06
Regular replenishment
2Rp 9.5M05 Aug 202631 d
05 Jun 2026PR03
Regular replenishment
6Rp 9.1M04 Sept 202691 d
20 May 2026PR03
Regular replenishment
2Rp 9.1M18 Jul 202659 d
08 May 2026PR03
Regular replenishment
5Rp 9.3M15 Jun 202638 d
12 Mar 2026PR03
Regular replenishment
5Rp 9.3M24 Apr 202643 d
02 Nov 2025PR03
Regular replenishment
3Rp 9.2M07 Dec 202535 d
07 Aug 2025PR05
Project / turnaround
3Rp 9.6M02 Dec 2025117 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Jun 20261201000031423Corrective
17 Apr 20262201000022069Corrective
18 Jan 20261201000004599Corrective
07 Jan 20261201000000795Corrective
31 Dec 20251201000028503Corrective
20 Dec 20252203000014056Turnaround
05 Nov 20251201000034931Corrective
28 Sept 20251209000031701Other maintenance
17 Aug 20252201000001187Corrective
05 Jul 20251201000038606Corrective