VALVE,GATE,6IN,150#,A216WCB,RF
Material 4100034944 · VALVE · Plant 1000
CMonitorSlow-moving
- Material
- 4100034944
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- SINAR TEKNIK INTERNASIONAL PT
- Lead time
- 45 d · P80 92 d
- Unit price
- Rp 3.1M
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~45 days; expected demand during lead time 0.0.
- 3.A 98.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.4%
stockout risk now 2%
Unit price
Rp 3.1M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 377 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.
Installed on 1 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_20-MS-8358-A22A-HS PIPE->16 FROM PP-583B TO VD-1859 | C | 3 | 1 | 0.01 |
Lead time and procurement
Lead time 45 ± 30 days (PO history + category, 1 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 May 2026 | PR03 Regular replenishment | 2 | Rp 3.1M | 10 Jul 2026 | 40 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 May 2025 | Medium | PX_20-MS-8358-A22A-HS | Clean dummy leg 20-MS-8358-A22A-HS |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Sept 2025 | 2 | 201000010418 | Corrective |