Sparely
DU

VALVE,GATE,1/4IN,300#,A105,RF

Material 4100035087 · VALVE · Plant 1000

AReduceNon-moving
Material
4100035087
Category
VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~47 days; expected demand during lead time 0.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.Stock 86 exceeds the level to keep (5) by 81.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
86 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 547.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_VD-272
WASH WATER DRUM
A100.08
PX_VD-1832A
COOLING WATER KO DRUM
C110.51

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
08 Sept 2026LowPX_BF-106Leak from packing
08 Sept 2026MediumPX_BF-106Painting BF-106
03 Sept 2026MediumPX_BF-106Install cover plate for MCP cracking

Recent goods issues

Never issued in the 17-month history.