VALVE,GATE,1/4IN,300#,CF8,RF

Material 4100035109 · VALVE · Plant 1000

BReduceSlow-moving
Material
4100035109
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
SINAR TEKNIK INTERNASIONAL PT
Lead time
54 d · P80 70 d
Unit price
Rp 2.8M

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~54 days; expected demand during lead time 0.0.
  • 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 2 exceeds the level to keep (1) by 1.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Single sourceOpen PO
On hand / on order
2 / 3
next delivery 26 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.8%
stockout risk now 0%
Unit price
Rp 2.8M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 385 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 16.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.

Installed on 2 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-531
LUBE OIL ACCUMULATOR
B100.08
PX_3/4-BF-12683-A21A
PIPE-3/4 FROM PP-301C TO HE-1205D
C200.01

Lead time and procurement

Lead time 54 ± 24 days (PO history, 3 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR03
Regular replenishment
1Rp 2.7M27 Oct 2026
open
48 d
03 Sept 2026PR03
Regular replenishment
2Rp 2.8M26 Oct 2026
open
53 d
31 May 2025PR03
Regular replenishment
2Rp 2.8M20 Aug 202581 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
11 Sept 20251201000020692Corrective