VALVE,GATE,1/2IN,150#,CF8,SW

Material 4100035142 · VALVE · Plant 1000

ALong-leadReorderCriticalSlow-moving
Material
4100035142
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
47 d · P80 92 d
Unit price
Rp 5.0M

Recommendation

  • 1.Forecast 35 EA/year: 35 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 4.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 29.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 28 now.
  • 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
28 EA
Rp 139.4M · order by 01 Oct 2026
Expected arrival ≈ 47 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 14
Rec. Max
29
order qty 11
Service level
99.9%
stockout risk now 77%
Unit price
Rp 5.0M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 25 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-111
CRACKING FURNACE BF-111
A1239.01

Lead time and procurement

Lead time 47 ± 30 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
15 Oct 2025PR03
Regular replenishment
2Rp 5.0M30 Nov 202546 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
08 Sept 2026LowPX_BF-106Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Dec 20253201000030083Corrective