VALVE,GATE,1/2IN,150#,CF8,SW
Material 4100035142 · VALVE · Plant 1000
ALong-leadReorderCriticalSlow-moving
- Material
- 4100035142
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 5.0M
Recommendation
- 1.Forecast 35 EA/year: 35 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~47 days; expected demand during lead time 4.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 29.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 28 now.
- 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
28 EA
Rp 139.4M · order by 01 Oct 2026
Expected arrival ≈ 47 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 14
Rec. Max
29
order qty 11
Service level
99.9%
stockout risk now 77%
Unit price
Rp 5.0M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 25 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1 | 23 | 9.01 |
Lead time and procurement
Lead time 47 ± 30 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Oct 2025 | PR03 Regular replenishment | 2 | Rp 5.0M | 30 Nov 2025 | 46 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Dec 2025 | 3 | 201000030083 | Corrective |