Sparely
DU

VALVE,GATE,1/2IN,150#,CF8,RF

Material 4100035263 · VALVE · Plant 1000

CMonitorInsurance gap
Material
4100035263
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~47 days; expected demand during lead time 0.1.
  • 3.A 95.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
5 / 7
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
95.1%
stockout risk now 5%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.

Installed on 3 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-LS-2770-D12A-H
PIPE-3/4 FROM PP-207 TO VD-185
C110.01
PX_1-IA-4097-A51A
PIPE-1 FROM KC-479C TO HE-1579B
C100.01
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Never issued in the 17-month history.