VALVE,GATE,1/2IN,150#,CF8,RF
Material 4100035263 · VALVE · Plant 1000
CMonitorInsurance gap
- Material
- 4100035263
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 2.6M (est.)
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~47 days; expected demand during lead time 0.1.
- 3.A 95.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
5 / 7
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
95.1%
stockout risk now 5%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_3/4-LS-2770-D12A-H PIPE-3/4 FROM PP-207 TO VD-185 | C | 1 | 1 | 0.01 |
| PX_1-IA-4097-A51A PIPE-1 FROM KC-479C TO HE-1579B | C | 1 | 0 | 0.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 1 | 23 | 9.44 |
Lead time and procurement
Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 12 Aug 2026 | Medium | PX_BF-108 | Peep door broken BF-108 |
| 27 Jul 2026 | Low | PX_BF-108 | Cleaning burner BF-108 |
| 04 Jul 2026 | High | PX_BF-108 | Install scaffolding at BF-108 |
| 04 Jul 2026 | Medium | PX_BF-108 | Leak from packing |
| 16 Jun 2026 | High | PX_BF-108 | Leak from packing |
| 03 May 2026 | Medium | PX_BF-108 | Replace burner tip BF-108 |
Recent goods issues
Never issued in the 17-month history.