VALVE,GATE,10IN,800#,CF8,SW
Material 4100035415 · VALVE · Plant 1000
AReduceNon-moving
- Material
- 4100035415
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 2.6M (est.)
Recommendation
- 1.Forecast 1.5 EA/year: 1.5 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~47 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.Stock 32 exceeds the level to keep (5) by 27.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
32 / 0
no open PO
Today Min / Max
5 / 15
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 500.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
Lead time and procurement
Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 30 Aug 2026 | High | PX_BF-102 | Painting BF-102 |
| 27 Aug 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 14 Aug 2026 | Emergency | PX_BF-102 | Thermograph wall BF-102 |
| 12 Aug 2026 | High | PX_BF-102 | Peep door broken BF-102 |
| 12 Aug 2026 | High | PX_BF-102 | Replace lamp as per PM finding |
| 01 Aug 2026 | High | PX_BF-102 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.