Sparely
DU

VALVE,GATE,10IN,150#,A105,SW

Material 4100035524 · VALVE · Plant 1000

AReorderCriticalSlow-moving
Material
4100035524
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 17 EA/year: 17 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 2.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 25.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 24 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
24 EA
Rp 63.1M · order by 01 Oct 2026
Expected arrival ≈ 47 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 13
Rec. Max
25
order qty 10
Service level
99.9%
stockout risk now 36%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 338 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A12811.58

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing
08 Aug 2026LowPX_BF-104[MSI-B-26-MZB-191] Permanent repair
04 Aug 2026MediumPX_BF-104Thermograph wall BF-104
04 Aug 2026MediumPX_BF-104Peep door broken BF-104
21 Jul 2026MediumPX_BF-104Hot spot at convection BF-104

Recent goods issues

Posting dateQtyOrderOrder type
28 Oct 20255201000001795Corrective