VALVE,GATE,1/2IN,150#,A216WCB,SW

Material 4100035835 · VALVE · Plant 1000

CMonitorSlow-moving
Material
4100035835
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
BUANA TEKNIK SENTOSA PT
Lead time
78 d · P80 149 d
Unit price
Rp 6.0M

Recommendation

  • 1.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~78 days; expected demand during lead time 0.4.
  • 3.A 78.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single sourceOpen PO
On hand / on order
2 / 4
next delivery 08 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
78.4%
stockout risk now 0%
Unit price
Rp 6.0M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 209 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-LS-19613-A11A-C
PIPE-3/4 FROM PP-615A TO PP-1366A
C100.01

Lead time and procurement

Lead time 78 ± 43 days (PO history, 6 PO lines) · on-time 29%

PR dateTypeQtyUnit priceDeliveryLead time
30 Aug 2026PR03
Regular replenishment
2Rp 6.0M08 Oct 2026
open
39 d
21 Jun 2026PR03
Regular replenishment
2Rp 6.3M17 Nov 2026
open
149 d
03 Apr 2026PR06
Regular replenishment
3Rp 6.1M04 Jun 202662 d
24 Mar 2026PR06
Regular replenishment
3Rp 5.9M28 Jun 202696 d
03 Mar 2026PR03
Regular replenishment
2Rp 5.9M27 Apr 202655 d
16 Sept 2025PR05
Project / turnaround
2Rp 5.9M19 Feb 2026156 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
06 Mar 20261201000031408Corrective
10 Jan 20261201000015307Corrective
10 Jan 20262201000015307Corrective
09 Jan 20261201000015307Corrective