VALVE,GATE,6IN,300#,CF8,SW

Material 4100035859 · VALVE · Plant 1000

SReduceExcess
Material
4100035859
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
ANUGRAH PERKASA MAKMUR PT
Lead time
46 d · P80 92 d
Unit price
Rp 500,987

Recommendation

  • 1.Forecast 3.1 EA/year: 3.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~46 days; expected demand during lead time 0.4.
  • 3.A 94.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 5.
  • 4.Stock 61 exceeds the level to keep (5) by 56.
Single sourceOpen PO
On hand / on order
61 / 2
next delivery 02 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
5
order qty 4
Service level
94.1%
stockout risk now 0%
Unit price
Rp 500,987
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 46 ± 30 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
19 Aug 2026PR03
Regular replenishment
2Rp 483,85902 Nov 2026
open
75 d
18 Nov 2025PR06
Regular replenishment
1Rp 518,11503 Dec 202515 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Posting dateQtyOrderOrder type
08 Jul 20261201000003402Corrective