VALVE,GATE,6IN,300#,CF8,SW
Material 4100035859 · VALVE · Plant 1000
SReduceExcess
- Material
- 4100035859
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- ANUGRAH PERKASA MAKMUR PT
- Lead time
- 46 d · P80 92 d
- Unit price
- Rp 500,987
Recommendation
- 1.Forecast 3.1 EA/year: 3.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~46 days; expected demand during lead time 0.4.
- 3.A 94.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 5.
- 4.Stock 61 exceeds the level to keep (5) by 56.
Single sourceOpen PO
On hand / on order
61 / 2
next delivery 02 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
5
order qty 4
Service level
94.1%
stockout risk now 0%
Unit price
Rp 500,987
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~20 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-108 CRACKING FURNACE BF-108 | S | 1 | 23 | 9.44 |
Lead time and procurement
Lead time 46 ± 30 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Aug 2026 | PR03 Regular replenishment | 2 | Rp 483,859 | 02 Nov 2026 open | 75 d |
| 18 Nov 2025 | PR06 Regular replenishment | 1 | Rp 518,115 | 03 Dec 2025 | 15 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 12 Aug 2026 | Medium | PX_BF-108 | Peep door broken BF-108 |
| 27 Jul 2026 | Low | PX_BF-108 | Cleaning burner BF-108 |
| 04 Jul 2026 | High | PX_BF-108 | Install scaffolding at BF-108 |
| 04 Jul 2026 | Medium | PX_BF-108 | Leak from packing |
| 16 Jun 2026 | High | PX_BF-108 | Leak from packing |
| 03 May 2026 | Medium | PX_BF-108 | Replace burner tip BF-108 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jul 2026 | 1 | 201000003402 | Corrective |