VALVE,GLOBE,10IN,300#,A216WCB,SW
Material 4100036376 · VALVE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100036376
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 25 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 2.6M (est.)
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~47 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
- 5.Installed on 25 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 2.6M · order by 01 Oct 2026
Expected arrival ≈ 47 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 103 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 298.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 25 functional locations
2 with criticality A/B · 30 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-QO-7722-A21A-C PIPE-1 FROM HE-1081B TO PP-1303 | A | 1 | 0 | 0.01 |
| PX_3/4-BF-28395-B23A-HS PIPE-3/4 FROM HE-1201 TO PP-669A | B | 1 | 0 | 0.01 |
| PX_8-LS-5321-A21A-H PIPE-8 FROM HE-1510A TO HE-593C | C | 1 | 3 | 0.87 |
| PX_3/4-CW-25323-A51A PIPE-3/4 FROM HE-1569D TO PP-1821 | C | 1 | 1 | 0.01 |
| PX_1-1/2-IA-13310-A51A PIPE-1-1/2 FROM VD-733 TO PP-1865A | C | 1 | 0 | 0.01 |
| PX_1-1/2-QO-26818-A51A PIPE-1-1/2 FROM PP-682A TO HE-694C | C | 1 | 0 | 0.01 |
| PX_1-IA-1276-D12A-HS PIPE-1 FROM VD-671A TO PP-953A | C | 4 | 0 | 0.01 |
| PX_1-LS-22184-A22A-C PIPE-1 FROM PP-160B TO HE-118B | C | 1 | 0 | 0.01 |
| PX_10-MS-26384-B21A PIPE-10 FROM VD-181 TO KC-872A | C | 1 | 0 | 0.01 |
| PX_16-BF-25372-A22A-H PIPE->16 FROM PP-1665 TO PP-1982A | C | 1 | 0 | 0.01 |
| PX_16-FG-7453-A22A-H PIPE->16 FROM CL-1019 TO VD-295 | C | 1 | 0 | 0.01 |
| PX_2-BF-16657-A41A-T PIPE-2 FROM HE-754 TO CL-121 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Apr 2026 | Low | PX_8-LS-5321-A21A-H | Clean dummy leg 8-LS-5321-A21A-H |
| 25 Sept 2025 | Medium | PX_8-LS-5321-A21A-H | Replace lamp as per PM finding |
| 30 May 2025 | Medium | PX_3/4-CW-25323-A51A | PSM25/Replace lamp as per PM finding |
| 07 May 2025 | Medium | PX_8-LS-5321-A21A-H | Clean dummy leg 8-LS-5321-A21A-H |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Jun 2026 | 1 | 201000034999 | Corrective |