VALVE,GLOBE,10IN,300#,A216WCB,SW

Material 4100036376 · VALVE · Plant 1000

AReorderNormalBelow reorder point
Material
4100036376
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 25 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 25 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 2.6M · order by 01 Oct 2026
Expected arrival ≈ 47 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 103 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 298.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 25 functional locations

2 with criticality A/B · 30 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-QO-7722-A21A-C
PIPE-1 FROM HE-1081B TO PP-1303
A100.01
PX_3/4-BF-28395-B23A-HS
PIPE-3/4 FROM HE-1201 TO PP-669A
B100.01
PX_8-LS-5321-A21A-H
PIPE-8 FROM HE-1510A TO HE-593C
C130.87
PX_3/4-CW-25323-A51A
PIPE-3/4 FROM HE-1569D TO PP-1821
C110.01
PX_1-1/2-IA-13310-A51A
PIPE-1-1/2 FROM VD-733 TO PP-1865A
C100.01
PX_1-1/2-QO-26818-A51A
PIPE-1-1/2 FROM PP-682A TO HE-694C
C100.01
PX_1-IA-1276-D12A-HS
PIPE-1 FROM VD-671A TO PP-953A
C400.01
PX_1-LS-22184-A22A-C
PIPE-1 FROM PP-160B TO HE-118B
C100.01
PX_10-MS-26384-B21A
PIPE-10 FROM VD-181 TO KC-872A
C100.01
PX_16-BF-25372-A22A-H
PIPE->16 FROM PP-1665 TO PP-1982A
C100.01
PX_16-FG-7453-A22A-H
PIPE->16 FROM CL-1019 TO VD-295
C100.01
PX_2-BF-16657-A41A-T
PIPE-2 FROM HE-754 TO CL-121
C100.01

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Apr 2026LowPX_8-LS-5321-A21A-HClean dummy leg 8-LS-5321-A21A-H
25 Sept 2025MediumPX_8-LS-5321-A21A-HReplace lamp as per PM finding
30 May 2025MediumPX_3/4-CW-25323-A51APSM25/Replace lamp as per PM finding
07 May 2025MediumPX_8-LS-5321-A21A-HClean dummy leg 8-LS-5321-A21A-H

Recent goods issues

Posting dateQtyOrderOrder type
20 Jun 20261201000034999Corrective