VALVE,GLOBE,6IN,150#,A105,RF
Material 4100036392 · VALVE · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4100036392
- Category
- VALVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (2 of 7 FuncLocs A/B)
- Supplier
- PRIMA INDUSTRI MAKMUR PT
- Lead time
- 42 d · P80 92 d
- Unit price
- Rp 8.0M
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~42 days; expected demand during lead time 0.1.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
- 7.ML early warning: 34% probability of demand in the next 90 days.
Proposed purchase requisition
2 EA
Rp 15.9M · order by 01 Oct 2026
Expected arrival ≈ 42 days
Long-leadML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.5%
stockout risk now 10%
Unit price
Rp 8.0M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 303 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 93.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.
Installed on 7 functional locations
2 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_2-BF-25172-A41A-T PIPE-2 FROM HE-1650B TO HE-682D | B | 1 | 0 | 0.01 |
| PX_3/4-FG-6875-B21A-T PIPE-3/4 FROM PP-1337 TO VD-511A | B | 1 | 0 | 0.01 |
| PX_1-1/2-P-1887-A11A PIPE-1-1/2 FROM PP-1202 TO HE-1201C | C | 1 | 4 | 1.30 |
| PX_1-CW-4270-A51A-T PIPE-1 FROM KC-369B TO VD-1906 | C | 1 | 2 | 0.44 |
| PX_1-FG-14409-D12A-C PIPE-1 FROM PP-1205A TO HE-1959D | C | 4 | 0 | 0.01 |
| PX_12-FG-11161-B23A-H PIPE-12 FROM VD-953B TO VD-240A | C | 3 | 0 | 0.01 |
| PX_3-FG-15752-A21A-T PIPE-3 FROM KC-511C TO VD-422 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 42 ± 30 days (PO history + category, 1 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Jul 2026 | PR03 Regular replenishment | 2 | Rp 8.0M | 27 Jul 2026 | 26 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_1-1/2-P-1887-A11A | [MSI-B-26-HXB-137] Permanent repair |
| 17 Sept 2026 | Emergency | PX_1-1/2-P-1887-A11A | Install scaffolding at 1-1/2-P-1887-A11A |
| 07 Sept 2026 | High | PX_1-1/2-P-1887-A11A | Replace pipe 1-1/2-P-1887-A11A |
| 25 Aug 2026 | Medium | PX_1-CW-4270-A51A-T | Reinject compound online clamp sealing |
| 12 Aug 2025 | Medium | PX_1-1/2-P-1887-A11A | Leak from packing |
| 14 May 2025 | Medium | PX_1-CW-4270-A51A-T | Clean dummy leg 1-CW-4270-A51A-T |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Dec 2025 | 1 | 201000017488 | Corrective |
| 09 Nov 2025 | 1 | 201000012771 | Corrective |