VALVE,GLOBE,6IN,150#,A105,RF

Material 4100036392 · VALVE · Plant 1000

BLong-leadReorderCriticalStockout
Material
4100036392
Category
VALVE
Base unit
EA
MRP type
Non Stock
Criticality
B (2 of 7 FuncLocs A/B)
Supplier
PRIMA INDUSTRI MAKMUR PT
Lead time
42 d · P80 92 d
Unit price
Rp 8.0M

Recommendation

  • 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~42 days; expected demand during lead time 0.1.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
  • 7.ML early warning: 34% probability of demand in the next 90 days.
Proposed purchase requisition
2 EA
Rp 15.9M · order by 01 Oct 2026
Expected arrival ≈ 42 days
Long-leadML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.5%
stockout risk now 10%
Unit price
Rp 8.0M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 303 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 93.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.

Installed on 7 functional locations

2 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_2-BF-25172-A41A-T
PIPE-2 FROM HE-1650B TO HE-682D
B100.01
PX_3/4-FG-6875-B21A-T
PIPE-3/4 FROM PP-1337 TO VD-511A
B100.01
PX_1-1/2-P-1887-A11A
PIPE-1-1/2 FROM PP-1202 TO HE-1201C
C141.30
PX_1-CW-4270-A51A-T
PIPE-1 FROM KC-369B TO VD-1906
C120.44
PX_1-FG-14409-D12A-C
PIPE-1 FROM PP-1205A TO HE-1959D
C400.01
PX_12-FG-11161-B23A-H
PIPE-12 FROM VD-953B TO VD-240A
C300.01
PX_3-FG-15752-A21A-T
PIPE-3 FROM KC-511C TO VD-422
C100.01

Lead time and procurement

Lead time 42 ± 30 days (PO history + category, 1 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
01 Jul 2026PR03
Regular replenishment
2Rp 8.0M27 Jul 202626 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_1-1/2-P-1887-A11A[MSI-B-26-HXB-137] Permanent repair
17 Sept 2026EmergencyPX_1-1/2-P-1887-A11AInstall scaffolding at 1-1/2-P-1887-A11A
07 Sept 2026HighPX_1-1/2-P-1887-A11AReplace pipe 1-1/2-P-1887-A11A
25 Aug 2026MediumPX_1-CW-4270-A51A-TReinject compound online clamp sealing
12 Aug 2025MediumPX_1-1/2-P-1887-A11ALeak from packing
14 May 2025MediumPX_1-CW-4270-A51A-TClean dummy leg 1-CW-4270-A51A-T

Recent goods issues

Posting dateQtyOrderOrder type
02 Dec 20251201000017488Corrective
09 Nov 20251201000012771Corrective