Sparely
DU

VALVE,GLOBE,10IN,800#,A105,SW

Material 4100036428 · VALVE · Plant 1000

CMaintainNo stock needed
Material
4100036428
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 8 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA PERSADA PT
Lead time
46 d · P80 92 d
Unit price
Rp 5.5M

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~46 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 10 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 1%
Unit price
Rp 5.5M
PO history
ML early warning: 26% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 867,386/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.

Installed on 8 functional locations

0 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-P-22530-A41A-T
PIPE-1 FROM VD-1035D TO VD-719
C141.73
PX_54-IA-28387-B21A-HS
PIPE->16 FROM PP-1266 TO KC-435A
C120.44
PX_1-BF-19588-B23A
PIPE-1 FROM HE-119A TO KC-423
C100.01
PX_10-BF-15210-A22A-C
PIPE-10 FROM PP-1205A TO HE-163A
C100.01
PX_2-P-1882-B21A
PIPE-2 FROM HE-605 TO HE-1473C
C100.01
PX_3-P-13128-A21A-C
PIPE-3 FROM HE-935A TO PP-1710
C100.01
PX_3/4-DS-26215-A22A-H
PIPE-3/4 FROM VD-1908 TO HE-1041A
C100.01
PX_3/4-HS-2049-A51A
PIPE-3/4 FROM KC-236B TO VD-1976
C100.01

Lead time and procurement

Lead time 46 ± 30 days (PO history + category, 1 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
28 Aug 2026PR04
Regular (other)
1Rp 5.5M10 Oct 2026
open
43 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Dec 2025HighPX_54-IA-28387-B21A-HSClean dummy leg 54-IA-28387-B21A-HS
11 Nov 2025MediumPX_1-P-22530-A41A-TLeak from packing
21 Oct 2025MediumPX_1-P-22530-A41A-TLeak at 1-P-22530-A41A-T
08 Oct 2025EmergencyPX_1-P-22530-A41A-TLeak at 1-P-22530-A41A-T
29 Jun 2025HighPX_1-P-22530-A41A-TReinject compound online clamp sealing
09 May 2025MediumPX_54-IA-28387-B21A-HSPSM25/Leak at 54-IA-28387-B21A-HS

Recent goods issues

Never issued in the 17-month history.