VALVE,GLOBE,3/4IN,150#,A105,RF

Material 4100036571 · VALVE · Plant 1000

CReduceSlow-moving
Material
4100036571
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
ANUGRAH SARANA JAYA PT
Lead time
41 d · P80 46 d
Unit price
Rp 13.4M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~41 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 2 exceeds the level to keep (0) by 2.
Convert to Non StockSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 13.4M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (3 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4,867/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-P-6518-A41A-HS
PIPE-3/4 FROM KC-669 TO HE-1808D
C100.01

Lead time and procurement

Lead time 41 ± 27 days (PO history, 3 PO lines) · on-time 60%

PR dateTypeQtyUnit priceDeliveryLead time
30 Dec 2025PR06
Regular replenishment
1Rp 13.4M01 Mar 202661 d
28 Dec 2025PR06
Regular replenishment
1Rp 13.4M15 Jan 202618 d
02 Dec 2025PR06
Regular replenishment
1Rp 12.7M26 Dec 202524 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
09 Feb 20262203000032991Turnaround
06 Feb 20261203000032991Turnaround