Sparely
DU

VALVE,GLOBE,1-1/2IN,150#,A216WCB,RF

Material 4100037989 · VALVE · Plant 1000

CReduceSlow-moving
Material
4100037989
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
BUANA TEKNIK SENTOSA PT
Lead time
45 d · P80 92 d
Unit price
Rp 4.4M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~45 days; expected demand during lead time 0.0.
  • 3.A 97.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 124 exceeds the level to keep (2) by 122.
Single source
On hand / on order
124 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.6%
stockout risk now 0%
Unit price
Rp 4.4M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 266 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_8-BF-20994-B23A-C
PIPE-8 FROM KC-675 TO VD-1850
C110.01

Lead time and procurement

Lead time 45 ± 30 days (PO history + category, 1 PO lines) · on-time 29%

PR dateTypeQtyUnit priceDeliveryLead time
20 May 2026PR04
Regular (other)
2Rp 4.4M28 Jun 202639 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
31 May 2025MediumPX_8-BF-20994-B23A-CLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
08 Jan 20262201000013162Corrective