VALVE,NEEDLE,1/2IN NPT,6000PSI,SS316

Material 4100038266 · VALVE · Plant 1000

AReorderNormalBelow reorder point
Material
4100038266
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 17 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
36 d · P80 32 d
Unit price
Rp 1.5M

Recommendation

  • 1.Forecast 4.6 EA/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~36 days; expected demand during lead time 0.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 17 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 59% probability of demand in the next 90 days.
  • 7.Identical part 4100038844, 4100039379 holds spare stock: transfer 6 EA instead of buying, then buy the remaining 2.
Proposed purchase requisition
2 EA
Rp 3.1M · order by 01 Oct 2026
Expected arrival ≈ 36 days
ML early warningSingle sourceSame description as 3 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
99.9%
stockout risk now 31%
Unit price
Rp 1.5M
PO history
ML early warning: 59% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 35 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 17 functional locations

6 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1842
FLOW
A100.04
PX_LIT-1245A-5A
HE-337B LEVEL
A100.03
PX_LIT-243
LEVEL
A400.03
PX_PGI-1537A-36B
HE-1529C DISCHARGE
B110.02
PX_FIT-1622
FLOW
B100.04
PX_PIT-119
PRESSURE
B100.04
PX_PIT-1283
PRESSURE
C130.90
PX_PIT-797B
PRESSURE
C310.04
PX_DPT-779
PP-1716 DP
C100.06
PX_FIT-148A
C3 RECYCLE FLOW
C100.04
PX_LIT-1060
PP-506A LEVEL
C200.03
PX_LIT-1895
LEVEL
C200.03

Lead time and procurement

Lead time 36 ± 12 days (PO history, 6 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
02 Aug 2026PR03
Regular replenishment
2Rp 1.5M01 Sept 202630 d
07 Jun 2026PR03
Regular replenishment
4Rp 1.6M06 Jul 202629 d
19 Jan 2026PR03
Regular replenishment
1Rp 1.5M17 Feb 202629 d
24 Dec 2025PR03
Regular replenishment
3Rp 1.6M28 Jan 202635 d
16 Oct 2025PR06
Regular replenishment
3Rp 1.5M17 Nov 202532 d
24 Aug 2025PR03
Regular replenishment
3Rp 1.5M22 Sept 202529 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Mar 2026MediumPX_PIT-1283Leak from packing
07 Oct 2025LowPX_PIT-1283Check PIT-1283.ok
27 May 2025LowPX_PIT-1283Check PIT-1283.ok
26 May 2025MediumPX_PGI-1537A-36BReplace lamp as per PM finding
22 May 2025MediumPX_PIT-797BAR25/tranmsitter low performance

Recent goods issues

Posting dateQtyOrderOrder type
27 Aug 20262201000001746Corrective
29 Jul 20261201000003103Corrective
28 Jul 20261201000003103Corrective
08 Jan 20261201000000822Corrective
08 Dec 20251201000003397Corrective