VALVE,NEEDLE,1/4IN NPT,6000PSI,SS316

Material 4100038293 · VALVE · Plant 1000

ALong-leadTransferCriticalStockout
Material
4100038293
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 16 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
61 d · P80 95 d
Unit price
Rp 758,625

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~61 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 5 needed.
  • 5.Long lead time: 80% of deliveries took up to 95 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 16 FuncLoc(s), 7 of them criticality A/B.
  • 7.Identical part 4100039028, 4100038706 holds spare stock: transfer 5 EA instead of buying — no purchase needed.
Long-leadSingle sourceSame description as 3 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 11%
Unit price
Rp 758,625
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 296 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 308.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 16 functional locations

7 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1377
COOLING WATER PRESSURE
A100.04
PX_TIT-1967
TEMPERATURE
A100.04
PX_TIT-616
HE-528A TEMPERATURE
A100.04
PX_PGI-1703
PRESSURE GAUGE
B100.02
PX_PGI-1790-8A
BF-111 DISCHARGE
B100.02
PX_TIT-1414A
TEMPERATURE
B100.04
PX_TIT-763
TEMPERATURE
B100.04
PX_PGI-1239
PRESSURE GAUGE
C100.02
PX_PGI-1673D
HE-274C BTM
C100.02
PX_PGI-690A-46B
PP-1101A DISCHARGE
C100.02
PX_PIT-1095A
PRESSURE
C100.04
PX_PIT-148
LEAN AMINE PRESSURE
C100.04

Lead time and procurement

Lead time 61 ± 34 days (PO history, 3 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
12 Mar 2026PR03
Regular replenishment
2Rp 758,62525 Apr 202644 d
17 Feb 2026PR03
Regular replenishment
2Rp 764,78920 Apr 202662 d
22 Aug 2025PR05
Project / turnaround
1Rp 742,49017 Dec 2025117 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Dec 2025MediumPX_TIT-828A-53AR25/tranmsitter low performance
07 Jun 2025LowPX_TIT-828A-53TIT-828A-53 error

Recent goods issues

Posting dateQtyOrderOrder type
09 Dec 20252201000039227Corrective
10 Aug 20251201000018569Corrective