VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316

Material 4100038317 · VALVE · Plant 1000

AReduceExcess
Material
4100038317
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 2.9 EA/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.Stock 520 exceeds the level to keep (9) by 511.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
520 / 0
no open PO
Today Min / Max
4 / 13
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 34 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 415.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 7 functional locations

4 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-721-9B
SPENT CAUSTIC FLOW
A100.04
PX_FIT-1304
PP-1630A INLET FLOW
B400.04
PX_FIT-433A-16A
FLOW
B100.04
PX_PGI-1395
VD-1232 DISCHARGE
B100.02
PX_TIT-1913-15B
HE-1082D TEMPERATURE
C110.04
PX_LIT-310B
LEVEL
C100.03
PX_PGI-1776-27A
VD-1822 BTM
S100.02

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 May 2025MediumPX_TIT-1913-15BAR25/tranmsitter low performance

Recent goods issues

Posting dateQtyOrderOrder type
28 Aug 20264201000024605Corrective
14 Oct 20252204000017832Preventive