VALVE,NEEDLE,3/4IN NPT,6000PSI,SS316
Material 4100038337 · VALVE · Plant 1000
BReduceNon-moving
- Material
- 4100038337
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 10 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 2.6M (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~47 days; expected demand during lead time 0.0.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
- 5.Installed on 10 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.
Installed on 10 functional locations
1 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-1738 DILUTION STEAM FLOW | B | 1 | 0 | 0.04 |
| PX_TIT-1104A TEMPERATURE | C | 1 | 1 | 0.04 |
| PX_DPT-1793-3 DIFF. PRESSURE | C | 1 | 0 | 0.06 |
| PX_FIT-340C PP-1628A INLET FLOW | C | 1 | 0 | 0.04 |
| PX_LIT-464-5B KC-732D LEVEL | C | 2 | 0 | 0.03 |
| PX_PGI-730 PP-1546A BTM | C | 1 | 0 | 0.02 |
| PX_DPT-784-35B DIFF. PRESSURE | S | 1 | 0 | 0.06 |
| PX_LIT-871-19 LEVEL | S | 1 | 0 | 0.03 |
| PX_TIT-1570B-57B HE-1855B TEMPERATURE | S | 1 | 0 | 0.04 |
| PY_TIT-1536 PP-1478B TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 May 2025 | Medium | PX_TIT-1104A | PSM25/AR25/tranmsitter low performance |
Recent goods issues
Never issued in the 17-month history.