Sparely
DU

VALVE,NEEDLE,1/2IN NPT,3000PSI,SS316

Material 4100038374 · VALVE · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100038374
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 10 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
40 d · P80 92 d
Unit price
Rp 2.4M

Recommendation

  • 1.Forecast 4.2 EA/year: 4.2 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~40 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
  • 7.ML early warning: 50% probability of demand in the next 90 days.
Proposed purchase requisition
8 EA
Rp 19.4M · order by 01 Oct 2026
Expected arrival ≈ 40 days
Long-leadML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 30%
Unit price
Rp 2.4M
PO history
ML early warning: 50% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 99 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 10 functional locations

4 with criticality A/B · 13 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1763B
VD-706A SUCTION
A110.02
PX_PIT-1863B-26
PRESSURE
A100.04
PX_PGI-1499A
VD-1044 DISCHARGE
B100.02
PX_PIT-206
PP-1984A PRESSURE
B300.04
PX_FIT-947-2B
PP-1726 INLET FLOW
C110.04
PX_PGI-979
HE-771A DISCHARGE
C200.02
PY_PIT-211-50
LEAN AMINE PRESSURE
C100.04
PX_DPT-384A
DIFF. PRESSURE
S120.92
PX_DPT-867C
VD-531 DP
S100.06
PX_PIT-1306-27A
HE-1817C PRESSURE
S100.04

Lead time and procurement

Lead time 40 ± 30 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
12 Aug 2026PR06
Regular replenishment
1Rp 2.4M30 Aug 202618 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Nov 2025MediumPX_DPT-384AAR25/tranmsitter low performance
06 Aug 2025MediumPX_DPT-384AReplace lamp as per PM finding
18 May 2025MediumPX_FIT-947-2BReplace lamp as per PM finding
10 May 2025MediumPX_PGI-1763BInstall scaffolding at PGI-1763B

Recent goods issues

Posting dateQtyOrderOrder type
24 Jun 20261201000018159Corrective
13 Feb 20262201000017735Corrective
04 Jan 20261204000035657Preventive
16 Dec 20251201000004572Corrective
13 Oct 20252201000033840Corrective
26 Aug 20251201000037364Corrective
25 Aug 20251201000037364Corrective