VALVE,NEEDLE,3/4IN NPT,3000PSI,SS316
Material 4100038408 · VALVE · Plant 1000
AMaintainHealthy
- Material
- 4100038408
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 9 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 2.6M (est.)
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~47 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Installed on 9 FuncLoc(s), 5 of them criticality A/B.
Price estimatedLead time estimatedSame description as 5 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 166 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 163.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 9 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-600-3B PP-287D INLET FLOW | A | 1 | 1 | 0.04 |
| PX_DPT-462A KC-671D DP | A | 1 | 0 | 0.06 |
| PX_FIT-1454C HE-536 INLET FLOW | A | 3 | 0 | 0.04 |
| PX_FIT-1560A SLOP OIL FLOW | A | 1 | 0 | 0.04 |
| PX_PGI-1480-8B CL-1708 BTM | A | 1 | 0 | 0.02 |
| PX_LIT-670A HE-1562C LEVEL | C | 1 | 0 | 0.03 |
| PX_PGI-1034A PP-1747B DISCHARGE | C | 1 | 0 | 0.02 |
| PX_PIT-1210A-55A PRESSURE | C | 1 | 0 | 0.04 |
| PX_TIT-1745 CL-962 TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 May 2025 | Low | PX_FIT-600-3B | AR25/tranmsitter low performance |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Apr 2026 | 1 | 201000025522 | Corrective |