VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316
Material 4100038440 · VALVE · Plant 1000
ATransferNormalSlow-moving
- Material
- 4100038440
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- SAMUDRA UTAMA GLOBAL PT
- Lead time
- 23 d · P80 18 d
- Unit price
- Rp 1.9M
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 1 + on order 0 is at or below the reorder point: 4 needed.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
- 6.Identical part 4100038989 holds spare stock: transfer 4 EA instead of buying — no purchase needed.
Single sourceSame description as 9 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 6%
Unit price
Rp 1.9M
PO history
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 294 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 428.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 5 functional locations
3 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-1245A-5A HE-337B LEVEL | A | 1 | 0 | 0.03 |
| PX_PIT-247A-21 BFW PRESSURE | B | 1 | 0 | 0.04 |
| PX_TIT-982B-31 PP-902B TEMPERATURE | B | 1 | 0 | 0.04 |
| PX_DPT-817A-1 DIFF. PRESSURE | C | 4 | 2 | 0.92 |
| PX_FIT-469A-59 FLOW | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 12 days (PO history, 8 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Sept 2026 | PR06 Regular replenishment | 2 | Rp 1.9M | 27 Sept 2026 | 12 d |
| 07 Aug 2026 | PR03 Regular replenishment | 1 | Rp 1.8M | 20 Aug 2026 | 13 d |
| 21 May 2026 | PR03 Regular replenishment | 1 | Rp 1.9M | 09 Jun 2026 | 19 d |
| 08 Apr 2026 | PR03 Regular replenishment | 1 | Rp 2.0M | 24 Apr 2026 | 16 d |
| 03 Apr 2026 | PR03 Regular replenishment | 2 | Rp 1.9M | 10 Apr 2026 | 7 d |
| 27 Mar 2026 | PR03 Regular replenishment | 1 | Rp 1.9M | 09 Apr 2026 | 13 d |
| 16 Aug 2025 | PR03 Regular replenishment | 2 | Rp 1.9M | 26 Aug 2025 | 10 d |
| 03 Jul 2025 | PR03 Regular replenishment | 3 | Rp 2.0M | 25 Jul 2025 | 22 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Mar 2026 | High | PX_DPT-817A-1 | Check DPT-817A-1.ok |
| 04 Jun 2025 | Medium | PX_DPT-817A-1 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Dec 2025 | 2 | 201000005250 | Corrective |
| 15 Oct 2025 | 1 | 201000031460 | Corrective |
| 14 Oct 2025 | 1 | 201000031460 | Corrective |