Sparely
DU

VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316

Material 4100038440 · VALVE · Plant 1000

ATransferNormalSlow-moving
Material
4100038440
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
SAMUDRA UTAMA GLOBAL PT
Lead time
23 d · P80 18 d
Unit price
Rp 1.9M

Recommendation

  • 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 4 needed.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
  • 6.Identical part 4100038989 holds spare stock: transfer 4 EA instead of buying — no purchase needed.
Single sourceSame description as 9 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 6%
Unit price
Rp 1.9M
PO history
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 294 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 428.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 5 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-1245A-5A
HE-337B LEVEL
A100.03
PX_PIT-247A-21
BFW PRESSURE
B100.04
PX_TIT-982B-31
PP-902B TEMPERATURE
B100.04
PX_DPT-817A-1
DIFF. PRESSURE
C420.92
PX_FIT-469A-59
FLOW
S100.04

Lead time and procurement

Lead time 23 ± 12 days (PO history, 8 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
15 Sept 2026PR06
Regular replenishment
2Rp 1.9M27 Sept 202612 d
07 Aug 2026PR03
Regular replenishment
1Rp 1.8M20 Aug 202613 d
21 May 2026PR03
Regular replenishment
1Rp 1.9M09 Jun 202619 d
08 Apr 2026PR03
Regular replenishment
1Rp 2.0M24 Apr 202616 d
03 Apr 2026PR03
Regular replenishment
2Rp 1.9M10 Apr 20267 d
27 Mar 2026PR03
Regular replenishment
1Rp 1.9M09 Apr 202613 d
16 Aug 2025PR03
Regular replenishment
2Rp 1.9M26 Aug 202510 d
03 Jul 2025PR03
Regular replenishment
3Rp 2.0M25 Jul 202522 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Mar 2026HighPX_DPT-817A-1Check DPT-817A-1.ok
04 Jun 2025MediumPX_DPT-817A-1Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
11 Dec 20252201000005250Corrective
15 Oct 20251201000031460Corrective
14 Oct 20251201000031460Corrective