VALVE,NEEDLE,1/4IN ODT,3000PSI,SS316

Material 4100038580 · VALVE · Plant 1000

SMaintainHealthy
Material
4100038580
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
43 d · P80 92 d
Unit price
Rp 2.9M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~43 days; expected demand during lead time 0.1.
  • 3.A 88.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single sourceSame description as 5 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
88.6%
stockout risk now 0%
Unit price
Rp 2.9M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 121 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-687-47A
PRESSURE
S100.04

Lead time and procurement

Lead time 43 ± 30 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
17 Oct 2025PR03
Regular replenishment
1Rp 2.9M17 Nov 202531 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
02 Jun 20261201000032841Corrective
01 Jun 20261201000032841Corrective