VALVE,NEEDLE,3/4IN ODT,6000PSI,SS316

Material 4100038646 · VALVE · Plant 1000

AMonitorInsurance gap
Material
4100038646
Category
VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~47 days; expected demand during lead time 0.0.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.6%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 7 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-450-23
VD-1906 PRESSURE
A100.04
PX_FIT-1398
FLOW
B100.04
PX_TIT-982B-31
PP-902B TEMPERATURE
B100.04
PX_PGI-631
PP-1914D SUCTION
C100.02
PX_PIT-1682-10B
PRESSURE
C100.04
PX_TIT-1795A
TEMPERATURE
C200.04
PX_PIT-688-21A
PRESSURE
S120.47

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Nov 2025LowPX_PIT-688-21APIT-688-21A error
11 May 2025MediumPX_PIT-688-21APSM25/Replace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.