VALVE,NEEDLE,1/4IN ODT,3000PSI,SS316

Material 4100038669 · VALVE · Plant 1000

ALong-leadMaintainHealthy
Material
4100038669
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 6 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
84 d · P80 92 d
Unit price
Rp 642,627

Recommendation

  • 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~84 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle sourceOpen POSame description as 5 other material numbers
On hand / on order
4 / 2
next delivery 27 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 642,627
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 11 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 493.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 6 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-984A-58B
HE-322C INLET FLOW
A100.04
PX_LIT-441
PP-1477B LEVEL
B100.03
PX_PGI-1075A
VD-1416A BTM
C110.02
PX_PGI-1208C
PRESSURE GAUGE
C300.02
PX_LIT-105
LEVEL
S100.03
PX_LIT-1662-9A
HE-1305B LEVEL
S100.03

Lead time and procurement

Lead time 84 ± 30 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
13 May 2026PR05
Project / turnaround
2Rp 643,43321 Aug 2026100 d
01 May 2026PR05
Project / turnaround
2Rp 641,82027 Oct 2026
open
179 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 May 2025MediumPX_PGI-1075AInstall scaffolding at PGI-1075A

Recent goods issues

Posting dateQtyOrderOrder type
20 Sept 20261201000033046Corrective
16 Feb 20261201000036952Corrective