VALVE,NEEDLE,1/4IN ODT,3000PSI,SS316
Material 4100038669 · VALVE · Plant 1000
ALong-leadMaintainHealthy
- Material
- 4100038669
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 6 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 84 d · P80 92 d
- Unit price
- Rp 642,627
Recommendation
- 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~84 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle sourceOpen POSame description as 5 other material numbers
On hand / on order
4 / 2
next delivery 27 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 642,627
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 11 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 493.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 6 functional locations
2 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-984A-58B HE-322C INLET FLOW | A | 1 | 0 | 0.04 |
| PX_LIT-441 PP-1477B LEVEL | B | 1 | 0 | 0.03 |
| PX_PGI-1075A VD-1416A BTM | C | 1 | 1 | 0.02 |
| PX_PGI-1208C PRESSURE GAUGE | C | 3 | 0 | 0.02 |
| PX_LIT-105 LEVEL | S | 1 | 0 | 0.03 |
| PX_LIT-1662-9A HE-1305B LEVEL | S | 1 | 0 | 0.03 |
Lead time and procurement
Lead time 84 ± 30 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 May 2026 | PR05 Project / turnaround | 2 | Rp 643,433 | 21 Aug 2026 | 100 d |
| 01 May 2026 | PR05 Project / turnaround | 2 | Rp 641,820 | 27 Oct 2026 open | 179 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 May 2025 | Medium | PX_PGI-1075A | Install scaffolding at PGI-1075A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2026 | 1 | 201000033046 | Corrective |
| 16 Feb 2026 | 1 | 201000036952 | Corrective |