VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316
Material 4100038723 · VALVE · Plant 1000
BTransferCriticalStockout
- Material
- 4100038723
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 2.6M (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~47 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: 2 needed.
- 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100038317 holds spare stock: transfer 2 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 3%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 311 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 23.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.
Installed on 6 functional locations
2 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TIT-256A TEMPERATURE | B | 1 | 1 | 0.04 |
| PX_PGI-767C-24A PP-1389A DISCHARGE | B | 1 | 0 | 0.02 |
| PX_PIT-817 FUEL OIL PRESSURE | C | 4 | 0 | 0.04 |
| PX_PIT-923 PP-1807C PRESSURE | C | 1 | 0 | 0.04 |
| PY_PGI-1199 PP-779A DISCHARGE | C | 1 | 0 | 0.02 |
| PX_PIT-1697 PRESSURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 May 2025 | Medium | PX_TIT-256A | Install scaffolding at TIT-256A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Nov 2025 | 1 | 201000010115 | Corrective |