VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316

Material 4100038723 · VALVE · Plant 1000

BTransferCriticalStockout
Material
4100038723
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 2 needed.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100038317 holds spare stock: transfer 2 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 3%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 311 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 23.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.

Installed on 6 functional locations

2 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TIT-256A
TEMPERATURE
B110.04
PX_PGI-767C-24A
PP-1389A DISCHARGE
B100.02
PX_PIT-817
FUEL OIL PRESSURE
C400.04
PX_PIT-923
PP-1807C PRESSURE
C100.04
PY_PGI-1199
PP-779A DISCHARGE
C100.02
PX_PIT-1697
PRESSURE
S100.04

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 May 2025MediumPX_TIT-256AInstall scaffolding at TIT-256A

Recent goods issues

Posting dateQtyOrderOrder type
24 Nov 20251201000010115Corrective