VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316
Material 4100038800 · VALVE · Plant 1000
BLong-leadTransferNormalBelow reorder point
- Material
- 4100038800
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 43 d · P80 92 d
- Unit price
- Rp 658,930
Recommendation
- 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~43 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 1 + on order 0 is at or below the reorder point: 5 needed.
- 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
- 7.Identical part 4100038989 holds spare stock: transfer 5 EA instead of buying — no purchase needed.
Long-leadSingle sourceSame description as 9 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 5%
Unit price
Rp 658,930
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 96 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 43.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.
Installed on 2 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_DPT-1355 DIFF. PRESSURE | B | 1 | 0 | 0.06 |
| PX_LIT-464-5B KC-732D LEVEL | C | 3 | 0 | 0.03 |
Lead time and procurement
Lead time 43 ± 30 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Jan 2026 | PR03 Regular replenishment | 3 | Rp 664,246 | 12 Mar 2026 | 45 d |
| 18 Aug 2025 | PR06 Regular replenishment | 2 | Rp 653,613 | 17 Sept 2025 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Jun 2026 | 3 | 201000036525 | Corrective |