Sparely
DU

VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316

Material 4100038800 · VALVE · Plant 1000

BLong-leadTransferNormalBelow reorder point
Material
4100038800
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
43 d · P80 92 d
Unit price
Rp 658,930

Recommendation

  • 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~43 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 5 needed.
  • 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 7.Identical part 4100038989 holds spare stock: transfer 5 EA instead of buying — no purchase needed.
Long-leadSingle sourceSame description as 9 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 5%
Unit price
Rp 658,930
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 96 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 43.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.

Installed on 2 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-1355
DIFF. PRESSURE
B100.06
PX_LIT-464-5B
KC-732D LEVEL
C300.03

Lead time and procurement

Lead time 43 ± 30 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jan 2026PR03
Regular replenishment
3Rp 664,24612 Mar 202645 d
18 Aug 2025PR06
Regular replenishment
2Rp 653,61317 Sept 202530 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 Jun 20263201000036525Corrective