VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316
Material 4100038836 · VALVE · Plant 1000
CTransferNormalBelow reorder point
- Material
- 4100038836
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- MEGA TEKNIK MAKMUR PT
- Lead time
- 50 d · P80 58 d
- Unit price
- Rp 559,620
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~50 days; expected demand during lead time 0.1.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
- 5.Identical part 4100038989 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Single sourceSame description as 9 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 559,620
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 12 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_LIT-1470 VD-312B LEVEL | C | 1 | 0 | 0.03 |
| PX_PIT-1817D-52A PRESSURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 50 ± 18 days (PO history, 6 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Aug 2026 | PR03 Regular replenishment | 1 | Rp 577,204 | 12 Sept 2026 | 42 d |
| 15 May 2026 | PR03 Regular replenishment | 2 | Rp 545,399 | 05 Jul 2026 | 51 d |
| 19 Mar 2026 | PR03 Regular replenishment | 1 | Rp 568,698 | 30 May 2026 | 72 d |
| 19 Mar 2026 | PR03 Regular replenishment | 2 | Rp 540,372 | 16 May 2026 | 58 d |
| 22 Nov 2025 | PR06 Regular replenishment | 2 | Rp 550,542 | 31 Dec 2025 | 39 d |
| 16 May 2025 | PR03 Regular replenishment | 2 | Rp 572,945 | 01 Jul 2025 | 46 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Sept 2026 | 1 | 201000017105 | Corrective |