VALVE,NEEDLE,1/2IN NPT,6000PSI,SS316

Material 4100038844 · VALVE · Plant 1000

BReduceSlow-moving
Material
4100038844
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 2.6M (est.)

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.1.
  • 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
  • 4.Stock 4 exceeds the level to keep (3) by 1.
  • 5.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
98.3%
stockout risk now 0%
Unit price
Rp 2.6M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 428 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 14.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.

Installed on 5 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1310
HE-1603 SUCTION
B110.02
PX_LIT-1662
LEVEL
C110.03
PX_PGI-565
VD-1831 DISCHARGE
C100.02
PX_PGI-690A-46B
PP-1101A DISCHARGE
C100.02
PX_PGI-1708A
HE-322C DISCHARGE
S100.02

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 May 2025MediumPX_LIT-1662Install scaffolding at LIT-1662
20 May 2025MediumPX_PGI-1310[MSI-B-25-CHV-140] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
30 Jul 20251201000008031Corrective
30 Jul 20252201000008031Corrective