VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316

Material 4100038989 · VALVE · Plant 1000

SReduceSlow-moving
Material
4100038989
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
42 d · P80 92 d
Unit price
Rp 404,783

Recommendation

  • 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~42 days; expected demand during lead time 0.1.
  • 3.A 93.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 51 exceeds the level to keep (2) by 49.
Single sourceSame description as 9 other material numbers
On hand / on order
51 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
93.1%
stockout risk now 0%
Unit price
Rp 404,783
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 290 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-686A
FLOW
S120.47

Lead time and procurement

Lead time 42 ± 30 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
19 Nov 2025PR06
Regular replenishment
2Rp 404,78315 Dec 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Mar 2026EmergencyPX_FIT-686A[MSI-B-26-YLM-221] Permanent repair
24 May 2025MediumPX_FIT-686AFIT-686A error

Recent goods issues

Posting dateQtyOrderOrder type
15 Dec 20253201000036707Corrective
02 Dec 20251201000028948Corrective