VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316
Material 4100039002 · VALVE · Plant 1000
CMonitorSlow-moving
- Material
- 4100039002
- Category
- VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 72 d · P80 92 d
- Unit price
- Rp 1.9M
Recommendation
- 1.Forecast 2.8 EA/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~72 days; expected demand during lead time 0.6.
- 3.A 85.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
Single sourceSame description as 9 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
85.4%
stockout risk now 15%
Unit price
Rp 1.9M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 301 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.
Installed on 2 functional locations
0 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-1657 HE-556A SUCTION | C | 4 | 3 | 1.30 |
| PX_FIT-1563A PP-1156A INLET FLOW | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 72 ± 30 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Apr 2026 | PR03 Regular replenishment | 1 | Rp 1.9M | 22 Sept 2026 | 148 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | Low | PX_PGI-1657 | Inspection PGI-1657.ok |
| 01 Sept 2025 | Low | PX_PGI-1657 | PGI-1657 broken |
| 21 Jul 2025 | Medium | PX_PGI-1657 | [MSI-B-25-XEN-357/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Dec 2025 | 3 | 201000039413 | Corrective |
| 03 Dec 2025 | 4 | 201000039413 | Corrective |