Sparely
DU

VALVE,NEEDLE,1/4IN NPT,6000PSI,SS316

Material 4100039125 · VALVE · Plant 1000

BLong-leadReorderNormalSlow-moving
Material
4100039125
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
41 d · P80 92 d
Unit price
Rp 2.2M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~41 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 4.4M · order by 01 Oct 2026
Expected arrival ≈ 41 days
Long-leadSingle sourceSame description as 3 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.2M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 417 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 42.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~20 days.

Installed on 1 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-1304-33
PP-818B DP
B420.49

Lead time and procurement

Lead time 41 ± 30 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
13 Dec 2025PR03
Regular replenishment
1Rp 2.2M04 Jan 202622 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Jul 2026LowPX_DPT-1304-33DPT-1304-33 error
18 May 2025MediumPX_DPT-1304-33PSM25/Repair insulation DPT-1304-33

Recent goods issues

Posting dateQtyOrderOrder type
10 Aug 20252201000025416Corrective
26 May 20251201000031885Corrective