VALVE,NEEDLE,1/4IN NPT,3000PSI,SS316

Material 4100039888 · VALVE · Plant 1000

CReduceSlow-moving
Material
4100039888
Category
VALVE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
44 d · P80 92 d
Unit price
Rp 428,270

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~44 days; expected demand during lead time 0.0.
  • 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 3 exceeds the level to keep (2) by 1.
Single sourceSame description as 5 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.1%
stockout risk now 0%
Unit price
Rp 428,270
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 375 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~20 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-1197-50A
DIFF. PRESSURE
C100.06
PX_PIT-1041
CHARGE GAS PRESSURE
S100.04

Lead time and procurement

Lead time 44 ± 30 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
12 Nov 2025PR03
Regular replenishment
1Rp 428,27015 Dec 202533 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20252201000025063Corrective