Sparely
DU

CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316

Material 4100039984 · CONNECTOR · Plant 1000

AReduceExcess
Material
4100039984
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (15 of 60 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
28 d · P80 37 d
Unit price
Rp 291,686

Recommendation

  • 1.Forecast 14 EA/year: 14 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~28 days; expected demand during lead time 1.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 20.
  • 4.Stock 22 exceeds the level to keep (20) by 2.
  • 5.Installed on 60 FuncLoc(s), 15 of them criticality A/B.
  • 6.ML early warning: 64% probability of demand in the next 90 days.
ML early warningSingle sourceAbnormal consumptionSame description as 19 other material numbers
On hand / on order
22 / 0
no open PO
Today Min / Max
13 / 36
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
20
order qty 14
Service level
99.9%
stockout risk now 0%
Unit price
Rp 291,686
PO history
ML early warning: 64% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 101 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 19 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 60 functional locations

15 with criticality A/B · 74 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-996
SLOP OIL FLOW
A120.04
PX_TIT-1612
TEMPERATURE
A110.04
PX_LIT-657
LEVEL
A100.03
PX_TEL-1676
KC-618B BTM
A100.01
PY_LIT-1742A-50A
PP-448 LEVEL
A100.03
PX_FIT-1115
HE-605 INLET FLOW
B120.47
PX_FIT-1494A
FLUSHING OIL FLOW
B100.04
PX_FIT-1738
DILUTION STEAM FLOW
B100.04
PX_FIT-229B
PP-790A INLET FLOW
B100.04
PX_PGI-683
VD-422 SUCTION
B100.02
PX_PIT-1324
PRESSURE
B100.04
PX_TEL-1540
TEMPERATURE
B100.01

Lead time and procurement

Lead time 28 ± 12 days (PO history, 12 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
28 Aug 2026PR03
Regular replenishment
14Rp 283,64228 Sept 202631 d
13 Aug 2026PR03
Regular replenishment
13Rp 273,00508 Sept 202626 d
25 May 2026PR03
Regular replenishment
10Rp 293,87923 Jun 202629 d
10 Apr 2026PR03
Regular replenishment
9Rp 296,10120 May 202640 d
30 Mar 2026PR03
Regular replenishment
10Rp 279,71624 Apr 202625 d
17 Jan 2026PR03
Regular replenishment
13Rp 291,95807 Feb 202621 d
04 Jan 2026PR06
Regular replenishment
13Rp 293,70218 Jan 202614 d
09 Nov 2025PR06
Regular replenishment
13Rp 292,30225 Dec 202546 d
30 Aug 2025PR03
Regular replenishment
15Rp 296,34915 Sept 202516 d
05 Aug 2025PR03
Regular replenishment
12Rp 291,41412 Sept 202538 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_PGI-147Replace PGI-147
22 Aug 2026LowPX_FIT-1115FIT-1115 error
02 Aug 2026LowPX_TEL-1939Replace lamp as per PM finding
06 Mar 2026EmergencyPX_PGI-147Repair insulation PGI-147
26 Dec 2025MediumPX_TEL-1049CLeak from packing
04 Dec 2025MediumPX_FIT-996Install scaffolding at FIT-996
05 Nov 2025LowPX_LIT-166Install scaffolding at LIT-166
03 Oct 2025EmergencyPX_PGI-147[MSI-B-25-GSG-347/M] Replace line
16 Jul 2025LowPX_PGI-147Replace lamp as per PM finding
15 Jul 2025MediumPX_TIT-1612Install scaffolding at TIT-1612

Recent goods issues

Posting dateQtyOrderOrder type
22 Jun 20261201000013071Corrective
16 Jun 20261201000014984Corrective
22 Jan 20261201000035361Corrective
21 Jan 20261201000035361Corrective
16 Jan 20261201000025571Corrective
03 Jan 20261201000021786Corrective
24 Dec 20253201000018957Corrective
20 Dec 20251201000028627Corrective
20 Dec 20251201000033402Corrective
11 Dec 20251201000026601Corrective
10 Dec 20252201000019124Corrective
05 Dec 20255201000006166Corrective
04 Dec 20251201000026242Corrective
28 Sept 20253201000035635Corrective
27 Sept 20251201000035635Corrective