Sparely
DU

CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316

Material 4100040018 · CONNECTOR · Plant 1000

ATransferCriticalStockout
Material
4100040018
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 23 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 43 d
Unit price
Rp 122,853 (est.)

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 4 needed.
  • 5.Installed on 23 FuncLoc(s), 7 of them criticality A/B.
  • 6.Identical part 4100041066 holds spare stock: transfer 4 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 18 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 8%
Unit price
Rp 122,853
Category + unit estimate
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 271 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 311.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 23 functional locations

7 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-1385
TEMPERATURE
A210.01
PX_LIT-1218C-43B
LEVEL
A100.03
PX_TIT-121-44
HE-239D TEMPERATURE
A100.04
PX_TIT-183C
VD-557 TEMPERATURE
A100.04
PX_FIT-1676A
METHANOL FLOW
B100.04
PX_FIT-738
FLOW
B100.04
PX_PIT-373-24A
PRESSURE
B100.04
PX_TEL-1939
TEMPERATURE
C120.44
PX_FIT-1696
FLOW
C110.47
PX_FIT-763B
FLOW
C110.04
PX_LIT-1662
LEVEL
C110.03
PX_DPT-1262
PP-899A DP
C200.06

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Aug 2026LowPX_TEL-1939Replace lamp as per PM finding
16 Jul 2025MediumPX_FIT-763BInstall scaffolding at FIT-763B
13 Jun 2025MediumPX_FIT-1696Install cover plate for MCP cracking
30 May 2025MediumPX_LIT-1662Install scaffolding at LIT-1662
23 May 2025LowPX_TEL-1385TEL-1385 abnormal indication
09 May 2025MediumPX_TEL-1939TEL-1939 abnormal indication

Recent goods issues

Posting dateQtyOrderOrder type
03 Jan 20261201000005471Corrective
18 Dec 20251201000015071Corrective
13 May 20251201000015851Corrective