CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
Material 4100040018 · CONNECTOR · Plant 1000
ATransferCriticalStockout
- Material
- 4100040018
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 23 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 43 d
- Unit price
- Rp 122,853 (est.)
Recommendation
- 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: 4 needed.
- 5.Installed on 23 FuncLoc(s), 7 of them criticality A/B.
- 6.Identical part 4100041066 holds spare stock: transfer 4 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 18 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 8%
Unit price
Rp 122,853
Category + unit estimate
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 271 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 311.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 23 functional locations
7 with criticality A/B · 25 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1385 TEMPERATURE | A | 2 | 1 | 0.01 |
| PX_LIT-1218C-43B LEVEL | A | 1 | 0 | 0.03 |
| PX_TIT-121-44 HE-239D TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_TIT-183C VD-557 TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_FIT-1676A METHANOL FLOW | B | 1 | 0 | 0.04 |
| PX_FIT-738 FLOW | B | 1 | 0 | 0.04 |
| PX_PIT-373-24A PRESSURE | B | 1 | 0 | 0.04 |
| PX_TEL-1939 TEMPERATURE | C | 1 | 2 | 0.44 |
| PX_FIT-1696 FLOW | C | 1 | 1 | 0.47 |
| PX_FIT-763B FLOW | C | 1 | 1 | 0.04 |
| PX_LIT-1662 LEVEL | C | 1 | 1 | 0.03 |
| PX_DPT-1262 PP-899A DP | C | 2 | 0 | 0.06 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 Aug 2026 | Low | PX_TEL-1939 | Replace lamp as per PM finding |
| 16 Jul 2025 | Medium | PX_FIT-763B | Install scaffolding at FIT-763B |
| 13 Jun 2025 | Medium | PX_FIT-1696 | Install cover plate for MCP cracking |
| 30 May 2025 | Medium | PX_LIT-1662 | Install scaffolding at LIT-1662 |
| 23 May 2025 | Low | PX_TEL-1385 | TEL-1385 abnormal indication |
| 09 May 2025 | Medium | PX_TEL-1939 | TEL-1939 abnormal indication |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Jan 2026 | 1 | 201000005471 | Corrective |
| 18 Dec 2025 | 1 | 201000015071 | Corrective |
| 13 May 2025 | 1 | 201000015851 | Corrective |