CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316
Material 4100040047 · CONNECTOR · Plant 1000
ATransferNormalBelow reorder point
- Material
- 4100040047
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 13 FuncLocs A/B)
- Supplier
- SAMUDRA UTAMA GLOBAL PT
- Lead time
- 26 d · P80 28 d
- Unit price
- Rp 77,384
Recommendation
- 1.Forecast 4.1 EA/year: 4.1 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~26 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
- 4.On hand 2 + on order 0 is at or below the reorder point: 7 needed.
- 5.Installed on 13 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 39% probability of demand in the next 90 days.
- 7.Identical part 4100040931 holds spare stock: transfer 7 EA instead of buying — no purchase needed.
ML early warningSingle sourceSame description as 13 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 2%
Unit price
Rp 77,384
PO history
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 99 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 882.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 13 functional locations
4 with criticality A/B · 25 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-352 HE-1144C PRESSURE | A | 4 | 1 | 0.47 |
| PX_DPT-125 DIFF. PRESSURE | A | 1 | 0 | 0.06 |
| PY_LIT-978-17 LEVEL | B | 1 | 1 | 0.03 |
| PX_PGI-1623 PP-494C DISCHARGE | B | 4 | 0 | 0.02 |
| PX_PGI-787 PRESSURE GAUGE | C | 1 | 1 | 0.02 |
| PY_FIT-191-12B FLOW | C | 4 | 1 | 0.47 |
| PX_DPT-1952-19 DIFF. PRESSURE | C | 1 | 0 | 0.06 |
| PX_PGI-1127-21 PRESSURE GAUGE | C | 1 | 0 | 0.02 |
| PX_PGI-1883B VD-135A BTM | C | 1 | 0 | 0.02 |
| PX_TEL-1784 CRACKED GAS OUTLET BF-105 | C | 4 | 0 | 0.01 |
| PX_TEL-1808B TEMPERATURE | C | 1 | 0 | 0.01 |
| PY_PIT-211-50 LEAN AMINE PRESSURE | C | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 26 ± 13 days (PO history, 3 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Aug 2026 | PR06 Regular replenishment | 2 | Rp 77,384 | 27 Aug 2026 | 13 d |
| 04 Jun 2026 | PR03 Regular replenishment | 1 | Rp 80,508 | 27 Jun 2026 | 23 d |
| 17 Oct 2025 | PR06 Regular replenishment | 3 | Rp 77,346 | 18 Nov 2025 | 32 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Jul 2025 | High | PY_FIT-191-12B | Leak from packing |
| 20 Jul 2025 | High | PX_PIT-352 | AR25/tranmsitter low performance |
| 31 May 2025 | Medium | PY_LIT-978-17 | PSM25/AR25/tranmsitter low performance |
| 28 May 2025 | Low | PX_PGI-787 | Inspection PGI-787.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Jun 2026 | 1 | 201000018159 | Corrective |
| 23 Jun 2026 | 1 | 201000018159 | Corrective |
| 26 Feb 2026 | 1 | 201000000733 | Corrective |
| 29 Oct 2025 | 2 | 201000031419 | Corrective |
| 11 Jun 2025 | 2 | 201000014964 | Corrective |
| 09 Jun 2025 | 1 | 201000014964 | Corrective |