CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316

Material 4100040047 · CONNECTOR · Plant 1000

ATransferNormalBelow reorder point
Material
4100040047
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 13 FuncLocs A/B)
Supplier
SAMUDRA UTAMA GLOBAL PT
Lead time
26 d · P80 28 d
Unit price
Rp 77,384

Recommendation

  • 1.Forecast 4.1 EA/year: 4.1 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~26 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 2 + on order 0 is at or below the reorder point: 7 needed.
  • 5.Installed on 13 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 39% probability of demand in the next 90 days.
  • 7.Identical part 4100040931 holds spare stock: transfer 7 EA instead of buying — no purchase needed.
ML early warningSingle sourceSame description as 13 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 2%
Unit price
Rp 77,384
PO history
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 99 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 882.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 13 functional locations

4 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-352
HE-1144C PRESSURE
A410.47
PX_DPT-125
DIFF. PRESSURE
A100.06
PY_LIT-978-17
LEVEL
B110.03
PX_PGI-1623
PP-494C DISCHARGE
B400.02
PX_PGI-787
PRESSURE GAUGE
C110.02
PY_FIT-191-12B
FLOW
C410.47
PX_DPT-1952-19
DIFF. PRESSURE
C100.06
PX_PGI-1127-21
PRESSURE GAUGE
C100.02
PX_PGI-1883B
VD-135A BTM
C100.02
PX_TEL-1784
CRACKED GAS OUTLET BF-105
C400.01
PX_TEL-1808B
TEMPERATURE
C100.01
PY_PIT-211-50
LEAN AMINE PRESSURE
C100.04

Lead time and procurement

Lead time 26 ± 13 days (PO history, 3 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
14 Aug 2026PR06
Regular replenishment
2Rp 77,38427 Aug 202613 d
04 Jun 2026PR03
Regular replenishment
1Rp 80,50827 Jun 202623 d
17 Oct 2025PR06
Regular replenishment
3Rp 77,34618 Nov 202532 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Jul 2025HighPY_FIT-191-12BLeak from packing
20 Jul 2025HighPX_PIT-352AR25/tranmsitter low performance
31 May 2025MediumPY_LIT-978-17PSM25/AR25/tranmsitter low performance
28 May 2025LowPX_PGI-787Inspection PGI-787.ok

Recent goods issues

Posting dateQtyOrderOrder type
24 Jun 20261201000018159Corrective
23 Jun 20261201000018159Corrective
26 Feb 20261201000000733Corrective
29 Oct 20252201000031419Corrective
11 Jun 20252201000014964Corrective
09 Jun 20251201000014964Corrective