Sparely
DU

CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316

Material 4100040086 · CONNECTOR · Plant 1000

AMonitorInsurance gap
Material
4100040086
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 15 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 43 d
Unit price
Rp 122,853 (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 15 FuncLoc(s), 5 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 19 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 122,853
Category + unit estimate
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 15 functional locations

5 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-961B
VD-378 BTM
A110.01
PX_TIT-199
CL-658 TEMPERATURE
A100.04
PX_TIT-359
TEMPERATURE
A100.04
PX_FIT-1757
PP-1891B INLET FLOW
B100.04
PX_FIT-433A-16A
FLOW
B100.04
PX_PIT-889
PRESSURE
C110.47
PX_FIT-1771-33A
BFW FLOW
C100.04
PX_PGI-1937C
PRESSURE GAUGE
C100.02
PX_PIT-1210A-55A
PRESSURE
C100.04
PX_TEL-504A
HE-1715D OUTLET
C100.01
PX_TEL-649A-19B
TEMPERATURE
C200.01
PX_TEL-176
TEMPERATURE
S110.01

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Aug 2025LowPX_TEL-961BInstall scaffolding at TEL-961B
15 Jun 2025HighPX_PIT-889Replace lamp as per PM finding
09 May 2025MediumPX_TEL-176TEL-176 abnormal indication

Recent goods issues

Never issued in the 17-month history.