CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316

Material 4100040147 · CONNECTOR · Plant 1000

ATransferNormalBelow reorder point
Material
4100040147
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 9 FuncLocs A/B)
Supplier
SAMUDRA UTAMA GLOBAL PT
Lead time
35 d · P80 43 d
Unit price
Rp 51,668

Recommendation

  • 1.Forecast 4.6 EA/year: 4.6 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~35 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 2 + on order 0 is at or below the reorder point: 7 needed.
  • 5.Installed on 9 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 36% probability of demand in the next 90 days.
  • 7.Identical part 4100040262 holds spare stock: transfer 7 EA instead of buying — no purchase needed.
ML early warningSingle sourceSame description as 16 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 5%
Unit price
Rp 51,668
PO history
ML early warning: 36% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 79 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 8 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 9 functional locations

2 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1114-58B
HE-826A SUCTION
A110.02
PX_TEL-1352-12B
TEMPERATURE
A300.01
PX_TIT-1402
HE-552B TEMPERATURE
C120.90
PX_TEL-277
HE-840C OUTLET
C100.01
PY_TEL-1504
TEMPERATURE
C100.01
PX_TEL-1750
PP-584A BTM
S110.01
PX_DPT-1467-17B
DIFF. PRESSURE
S100.06
PX_DPT-694
KC-228B DP
S100.06
PY_TEL-1304B
HE-1093A OUTLET
S100.01

Lead time and procurement

Lead time 35 ± 17 days (PO history, 7 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
21 May 2026PR06
Regular replenishment
2Rp 53,16706 Jun 202616 d
31 Jan 2026PR03
Regular replenishment
5Rp 51,09115 Mar 202643 d
21 Jan 2026PR03
Regular replenishment
2Rp 51,11416 Feb 202626 d
06 Dec 2025PR04
Regular (other)
2Rp 51,24916 Feb 202672 d
21 Sept 2025PR03
Regular replenishment
3Rp 51,92825 Oct 202534 d
04 Aug 2025PR03
Regular replenishment
2Rp 51,66814 Sept 202541 d
28 May 2025PR03
Regular replenishment
2Rp 54,83926 Jun 202529 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Feb 2026MediumPX_TIT-1402Replace lamp as per PM finding
07 Jun 2025MediumPX_TIT-1402TIT-1402 error
30 May 2025LowPX_PGI-1114-58BBroken PGI-1114-58B
11 May 2025MediumPX_TEL-1750TEL-1750 abnormal indication

Recent goods issues

Posting dateQtyOrderOrder type
14 Jul 20261201000028281Corrective
13 Jul 20261201000028281Corrective
25 Jan 20261201000031605Corrective
04 Sept 20253201000014542Corrective
04 Aug 20251201000015479Corrective
02 Aug 20251201000015479Corrective
16 May 20251201000004253Corrective
14 May 20251201000004253Corrective