Sparely
DU

CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316

Material 4100040167 · CONNECTOR · Plant 1000

ATransferNormalSlow-moving
Material
4100040167
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 8 FuncLocs A/B)
Supplier
GUNUNG UTAMA LESTARI PT
Lead time
23 d · P80 43 d
Unit price
Rp 318,210

Recommendation

  • 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 3 needed.
  • 5.Installed on 8 FuncLoc(s), 3 of them criticality A/B.
  • 6.Identical part 4100039984 holds spare stock: transfer 3 EA instead of buying — no purchase needed.
Single sourceSame description as 19 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 318,210
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 253 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 370.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 8 functional locations

3 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1343A
PRESSURE
A210.04
PX_TEL-1666
CRACKED GAS OUTLET BF-102
A100.01
PX_TEL-1802-42
HE-848C BTM
B100.01
PX_PGI-1673D
HE-274C BTM
C100.02
PX_LIT-1404-41B
LEVEL
S100.03
PX_TEL-1113B
TEMPERATURE
S100.01
PX_TEL-1239
HE-786 BTM
S100.01
PX_TIT-1157
TEMPERATURE
S100.04

Lead time and procurement

Lead time 23 ± 16 days (PO history + category, 2 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
28 Jun 2026PR03
Regular replenishment
2Rp 318,87704 Jul 20266 d
16 Apr 2026PR06
Regular replenishment
1Rp 317,54207 May 202621 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 May 2025LowPX_PIT-1343ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
21 Jan 20261201000033500Corrective
01 Jan 20261201000039620Corrective
21 Sept 20251201000032509Corrective
27 Jul 20251201000013429Corrective