CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316
Material 4100040167 · CONNECTOR · Plant 1000
ATransferNormalSlow-moving
- Material
- 4100040167
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 8 FuncLocs A/B)
- Supplier
- GUNUNG UTAMA LESTARI PT
- Lead time
- 23 d · P80 43 d
- Unit price
- Rp 318,210
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: 3 needed.
- 5.Installed on 8 FuncLoc(s), 3 of them criticality A/B.
- 6.Identical part 4100039984 holds spare stock: transfer 3 EA instead of buying — no purchase needed.
Single sourceSame description as 19 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 318,210
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 253 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 370.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 8 functional locations
3 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1343A PRESSURE | A | 2 | 1 | 0.04 |
| PX_TEL-1666 CRACKED GAS OUTLET BF-102 | A | 1 | 0 | 0.01 |
| PX_TEL-1802-42 HE-848C BTM | B | 1 | 0 | 0.01 |
| PX_PGI-1673D HE-274C BTM | C | 1 | 0 | 0.02 |
| PX_LIT-1404-41B LEVEL | S | 1 | 0 | 0.03 |
| PX_TEL-1113B TEMPERATURE | S | 1 | 0 | 0.01 |
| PX_TEL-1239 HE-786 BTM | S | 1 | 0 | 0.01 |
| PX_TIT-1157 TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 16 days (PO history + category, 2 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Jun 2026 | PR03 Regular replenishment | 2 | Rp 318,877 | 04 Jul 2026 | 6 d |
| 16 Apr 2026 | PR06 Regular replenishment | 1 | Rp 317,542 | 07 May 2026 | 21 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 May 2025 | Low | PX_PIT-1343A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Jan 2026 | 1 | 201000033500 | Corrective |
| 01 Jan 2026 | 1 | 201000039620 | Corrective |
| 21 Sept 2025 | 1 | 201000032509 | Corrective |
| 27 Jul 2025 | 1 | 201000013429 | Corrective |