CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316
Material 4100040192 · CONNECTOR · Plant 1000
CMonitorSlow-moving
- Material
- 4100040192
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 7 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 29 d · P80 43 d
- Unit price
- Rp 345,396
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.ML early warning: 37% probability of demand in the next 90 days.
ML early warningSingle sourceOpen POSame description as 19 other material numbers
On hand / on order
2 / 2
next delivery 11 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 345,396
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 471 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~14 days.
Installed on 7 functional locations
0 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-556A VD-1620 OUTLET | C | 1 | 2 | 0.44 |
| PX_TIT-1120A-33A TEMPERATURE | C | 1 | 1 | 0.04 |
| PX_DPT-1654A VD-992 DP | C | 1 | 0 | 0.06 |
| PX_PGI-1283-59 PP-1168D BTM | C | 1 | 0 | 0.02 |
| PX_TEL-1163 TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_PIT-758B-19 KC-426D PRESSURE | S | 3 | 3 | 0.90 |
| PX_PIT-210-19A FEED PRESSURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 29 ± 16 days (PO history + category, 1 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Sept 2026 | PR03 Regular replenishment | 2 | Rp 345,396 | 11 Oct 2026 open | 29 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Mar 2026 | Medium | PX_PIT-758B-19 | PIT-758B-19 error |
| 16 Jan 2026 | Low | PX_TEL-556A | Install cover plate for MCP cracking |
| 18 Dec 2025 | Medium | PX_PIT-758B-19 | Leak from packing |
| 14 Jul 2025 | Medium | PX_TIT-1120A-33A | Painting TIT-1120A-33A |
| 10 May 2025 | Medium | PX_PIT-758B-19 | PIT-758B-19 reading frozen |
| 02 May 2025 | Low | PX_TEL-556A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Jun 2025 | 1 | 201000003138 | Corrective |