CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316

Material 4100040209 · CONNECTOR · Plant 1000

BTransferNormalBelow reorder point
Material
4100040209
Category
CONNECTOR
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 43 d
Unit price
Rp 122,853 (est.)

Recommendation

  • 1.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: 2 needed.
  • 5.Installed on 6 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100040262 holds spare stock: transfer 2 EA instead of buying — no purchase needed.
Convert to Stock ItemPrice estimatedLead time estimatedSame description as 16 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 122,853
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 100 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 135.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~14 days.

Installed on 6 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-1323-44B
CRACKED GAS OUTLET BF-102
B100.01
PX_PIT-893B
SEAL OIL PRESSURE
C110.47
PX_PGI-1673D
HE-274C BTM
C100.02
PX_TEL-669
VD-813 OUTLET
C100.01
PY_PGI-1629-35A
HE-880A BTM
C100.02
PY_PIT-211-50
LEAN AMINE PRESSURE
C100.04

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Jul 2025MediumPX_PIT-893BPIT-893B abnormal indication

Recent goods issues

Posting dateQtyOrderOrder type
23 Jun 20261201000018159Corrective
14 Jan 20261201000033216Corrective
08 Dec 20251201000039227Corrective
15 Oct 20251201000031442Corrective